Logo
  • Home
  • About Us
    • Aim and Scope
    • Research Area
    • Impact Factor
    • Indexing
  • For Authors
    • Authors Guidelines
    • How to publish paper?
    • Download Paper format
    • Submit Manuscript
    • Processing Charges
    • Download Copyrights Form
    • Submit Payment-Copyrights
  • Archives
    • Current Issues
    • Past Issues
    • Conference Issues
    • Special Issues
    • Advance Search
  • IJARIIE Board
    • Join as IJARIIE Board
    • Advisory Board
    • Editorial Board
    • Sr. Reviewer Board
    • Jr. Reviewer Board
  • Proposal
    • Conferece Proposal
    • Special Proposal
    • Faqs
  • Contact Us
  • Payment Detail

Call for Papers:Vol.11 Issue.4

Submission
Last date
28-Aug-2025
Acceptance Status In One Day
Paper Publish In Two Days
Submit ManuScript

News & Updates

Submit Article

Dear Authors, Article publish in our journal for Volume-11,Issue-4. For article submission on below link: Submit Manuscript


Join As Board

Dear Reviewer, You can join our Reviewer team without given any charges in our journal. Submit Details on below link: Join As Board


Paper Publication Charges

IJARIIE APP
Download Android App

For Authors

  • How to Publish Paper
  • Submit Manuscript
  • Processing Charges
  • Submit Payment

Archives

  • Current Issue
  • Past Issue

IJARIIE Board

  • Member Of Board
  • Join As Board

Downloads

  • Authors Guidelines
  • Manuscript Template
  • Copyrights Form

Android App

Download IJARIIE APP
  • Authors
  • Abstract
  • Citations
  • Downloads
  • Similar-Paper

Authors

Title: :  COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULU
PaperId: :  27080
Published in:   International Journal Of Advance Research And Innovative Ideas In Education
Publisher:   IJARIIE
e-ISSN:   2395-4396
Volume/Issue:    Volume 11 Issue 4 2025
DUI:    16.0415/IJARIIE-27080
Licence: :   IJARIIE is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Author NameAuthor Institute
Buyung MantapRatu Samban University
Rezi MunizarRatu Samban University
Wulan Puspa AnggrainiRatu Samban University
Yoka MahendraRatu Samban University

Abstract

Civil Engineering
Control, Cost, Time/Schedule, Project, Airport, Earned Value
Cost and time control are crucial components of project management. In addition to quality assessment, a project’s performance can also be evaluated based on cost and time. Significant deviations in cost and time indicate poor project management. One method that can be used to control both cost and time is the Earned Value Method. This method is used to analyze performance and to forecast target achievement. In its application, three main indicators are used: the Actual Cost of Work Performed (ACWP), which represents the actual cost incurred for completed work; the Budgeted Cost of Work Performed (BCWP), which is the budgeted cost for the actual work completed; and the Budgeted Cost of Work Scheduled (BCWS), which is the budgeted cost for the planned work. This study aims to analyze the status and performance projections of the new operational building construction project at Fatmawati Soekarno Airport Bengkulu using the Earned Value Method, estimate the projected cost at project completion, and estimate the expected project completion time. In general, the research analysis method begins with problem identification, followed by a preliminary study to gather necessary information, and then proceeds with data collection through field observation and monitoring. The results show that the Schedule Variance (SV) is positive, indicating that the project performance is relatively good, as the work packages are being completed ahead of schedule. The Schedule Performance Index (SPI) is 1.08, or greater than 1, which suggests that the project is performing efficiently by the 12th week. The work progress meets expectations (on time) and has exceeded the planned targets. The Cost Variance (CV) in the 12th week is also positive, amounting to IDR 47,***,***, meaning that the actual cost incurred is lower than the planned cost. This indicates that the project is financially favorable as of the 12th week, with a cost saving of IDR 47,***,***, The Cost Performance Index (CPI) in week 12 is 1.06, which suggests that the cost performance is relatively efficient since the actual costs are lower than the earned value, implying there is no wasteful spending. The estimated cost at project completion is projected to be IDR 997,***,***. In other words, the project is expected to yield a profit of IDR 61,***,***, or 5.83% of the total project value. The projected remaining cost from week 13 to the end of the project is estimated at IDR 227,060,810. Furthermore, the project is forecasted to be completed earlier than planned, with an estimated completion time of 18.5 weeks.

Citations

Copy and paste a formatted citation or use one of the links to import into a bibliography manager and reference.

IJARIIE Buyung Mantap, Rezi Munizar, Wulan Puspa Anggraini, and Yoka Mahendra. "COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULU" International Journal Of Advance Research And Innovative Ideas In Education Volume 11 Issue 4 2025 Page 435-442
MLA Buyung Mantap, Rezi Munizar, Wulan Puspa Anggraini, and Yoka Mahendra. "COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULU." International Journal Of Advance Research And Innovative Ideas In Education 11.4(2025) : 435-442.
APA Buyung Mantap, Rezi Munizar, Wulan Puspa Anggraini, & Yoka Mahendra. (2025). COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULU. International Journal Of Advance Research And Innovative Ideas In Education, 11(4), 435-442.
Chicago Buyung Mantap, Rezi Munizar, Wulan Puspa Anggraini, and Yoka Mahendra. "COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULU." International Journal Of Advance Research And Innovative Ideas In Education 11, no. 4 (2025) : 435-442.
Oxford Buyung Mantap, Rezi Munizar, Wulan Puspa Anggraini, and Yoka Mahendra. 'COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULU', International Journal Of Advance Research And Innovative Ideas In Education, vol. 11, no. 4, 2025, p. 435-442. Available from IJARIIE, http://ijariie.com/AdminUploadPdf/COST_AND_TIME_CONTROL_ANALYSIS_OF_THE_NEW_OPERATIONAL_BUILDING_CONSTRUCTION_PROJECT_AT_FATMAWATI_SOEKARNO_AIRPORT_BENGKULU_ijariie27080.pdf (Accessed : ).
Harvard Buyung Mantap, Rezi Munizar, Wulan Puspa Anggraini, and Yoka Mahendra. (2025) 'COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULU', International Journal Of Advance Research And Innovative Ideas In Education, 11(4), pp. 435-442IJARIIE [Online]. Available at: http://ijariie.com/AdminUploadPdf/COST_AND_TIME_CONTROL_ANALYSIS_OF_THE_NEW_OPERATIONAL_BUILDING_CONSTRUCTION_PROJECT_AT_FATMAWATI_SOEKARNO_AIRPORT_BENGKULU_ijariie27080.pdf (Accessed : )
IEEE Buyung Mantap, Rezi Munizar, Wulan Puspa Anggraini, and Yoka Mahendra, "COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULU," International Journal Of Advance Research And Innovative Ideas In Education, vol. 11, no. 4, pp. 435-442, Jul-Aug 2025. [Online]. Available: http://ijariie.com/AdminUploadPdf/COST_AND_TIME_CONTROL_ANALYSIS_OF_THE_NEW_OPERATIONAL_BUILDING_CONSTRUCTION_PROJECT_AT_FATMAWATI_SOEKARNO_AIRPORT_BENGKULU_ijariie27080.pdf [Accessed : ].
Turabian Buyung Mantap, Rezi Munizar, Wulan Puspa Anggraini, and Yoka Mahendra. "COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULU." International Journal Of Advance Research And Innovative Ideas In Education [Online]. volume 11 number 4 ().
Vancouver Buyung Mantap, Rezi Munizar, Wulan Puspa Anggraini, and Yoka Mahendra. COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULU. International Journal Of Advance Research And Innovative Ideas In Education [Internet]. 2025 [Cited : ]; 11(4) : 435-442. Available from: http://ijariie.com/AdminUploadPdf/COST_AND_TIME_CONTROL_ANALYSIS_OF_THE_NEW_OPERATIONAL_BUILDING_CONSTRUCTION_PROJECT_AT_FATMAWATI_SOEKARNO_AIRPORT_BENGKULU_ijariie27080.pdf
BibTex EndNote RefMan RefWorks

Number Of Downloads



Save in Google Drive

Similar-Paper

TitleArea of ResearchAuther NameAction
COST AND TIME CONTROL ANALYSIS OF THE NEW OPERATIONAL BUILDING CONSTRUCTION PROJECT AT FATMAWATI SOEKARNO AIRPORT BENGKULUCivil EngineeringBuyung Mantap Download
The Implementation of Earned Value Management (EVM) in Cost and Time Control of a Road Improvement ProjectCivil EngineeringIr. Rezi Munizar, S.T., M.T. Download
Predicting Cement Hydration and Mechanical Performance with Machine Learning and Supplementary Cementitious MaterialsConstruction EngineeringRAJAT PANDEY Download
Use of Rice Straw Ash as Cement Replacement Material in ConcreteCivil EngineeringV. John Sundar Raj Download
How Plastic Waste can be Utilized for the Stabilization of Soils for Road Pavement ConstructionCivil EngineeringAper E. Zava Download
ENHANCING THEORETICAL LEARNING IN ENGINEERING EDUCATION THROUGH AUGMENTED REALITYCIVIL ENGINEERING FELIX BIKETI Download
AUGMENTED REALITY AS A TOOL FOR PRACTICAL SKILLS DEVELOPMENT IN BUILDING AND CIVIL ENGINEERING PROGRAMMESCIVIL ENGINEERING FELIX BIKETI Download
EXPERIMENTAL INVESTIGATION AND ANALYSIS OF BAMBOO FRAMECIVIL ENGINEERINGMAHESWARI K Download
PARTIAL REPLACEMENT OF CEMENT USING SUGARCANE BAGGASE ASH TO ENCHANCE THE STRENGTH OF CONCRETECivil EngineeringDhanraj Balu Vitekar Download
HEC-RAS BASED HYDRAULIC MODELING OF PUS RIVER FOR FLOOD MANAGEMENTCivil Engineering Kunal D Manwar Download
Sewage water treatment plantCivil engineeringBhoopesh Ghorse Download
To increase the compressive strength of concrete by replacing fine aggregate with shredded steel wasteCivil EngineeringChandan Kumar Download
Analysis and Design of E-Waste Management: Enhancing Concrete with Recycled E-Wastecivil Engineering Palak Tomar Download
SUBGRADE STABILIZATION OF EXPANSIVE SOIL USING LIQUID POLYMERCivil engineering Deepak Singh Download
Study of Physical Characteristics of Self-healing ConcreteCivil EngineeringAbhay Singh Download
12
For Authors
  • Submit Paper
  • Processing Charges
  • Submit Payment
Archive
  • Current Issue
  • Past Issue
IJARIIE Board
  • Member Of Board
  • Join As Board
Privacy and Policy
Follow us

Contact Info
  • +91-8401209201 (India)
  • +86-15636082010 (China)
  • ijariiejournal@gmail.com
  • M-20/234 Ami Appt,
    Nr.Naranpura Tele-Exch,
    Naranpura,
    Ahemdabad-380063
    Gujarat,India.
Copyright © 2025. IJARIIE. All Rights Reserved.