Logo
  • Home
  • About Us
    • Aim and Scope
    • Research Area
    • Impact Factor
    • Indexing
  • For Authors
    • Authors Guidelines
    • How to publish paper?
    • Download Paper format
    • Submit Manuscript
    • Processing Charges
    • Download Copyrights Form
    • Submit Payment-Copyrights
  • Archives
    • Current Issues
    • Past Issues
    • Conference Issues
    • Special Issues
    • Advance Search
  • IJARIIE Board
    • Join as IJARIIE Board
    • Advisory Board
    • Editorial Board
    • Sr. Reviewer Board
    • Jr. Reviewer Board
  • Proposal
    • Conferece Proposal
    • Special Proposal
    • Faqs
  • Contact Us
  • Payment Detail

Call for Papers:Vol.11 Issue.3

Submission
Last date
28-Jun-2025
Acceptance Status In One Day
Paper Publish In Two Days
Submit ManuScript

News & Updates

Submit Article

Dear Authors, Article publish in our journal for Volume-11,Issue-3. For article submission on below link: Submit Manuscript


Join As Board

Dear Reviewer, You can join our Reviewer team without given any charges in our journal. Submit Details on below link: Join As Board


Paper Publication Charges

IJARIIE APP
Download Android App

For Authors

  • How to Publish Paper
  • Submit Manuscript
  • Processing Charges
  • Submit Payment

Archives

  • Current Issue
  • Past Issue

IJARIIE Board

  • Member Of Board
  • Join As Board

Downloads

  • Authors Guidelines
  • Manuscript Template
  • Copyrights Form

Android App

Download IJARIIE APP
  • Authors
  • Abstract
  • Citations
  • Downloads
  • Similar-Paper

Authors

Title: :  APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION
PaperId: :  6255
Published in:   International Journal Of Advance Research And Innovative Ideas In Education
Publisher:   IJARIIE
e-ISSN:   2395-4396
Volume/Issue:    Volume 3 Issue 4 2017
DUI:    16.0415/IJARIIE-6255
Licence: :   IJARIIE is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Author NameAuthor Institute
Kiran B ChougalaJain College of Egineering, Belagavi, Karnataka, India.
Amey KelkarJain College of Egineering, Belagavi, Karnataka, India.

Abstract

Civil Engineering
Project Management, Time overrun, Cost overrun, fast Tracking, etc
Construction technology includes a nice potential to enhance productivity and reduce project period. Delay happens in several construction activities, delays will cause wide negative effects like loss of productivity and revenue, and contract termination. Additionally, the paper presents the connection between new technology and time overrun in those projects. In India the amount of road development activities is increasing from time to time. However, it becomes tough to finish the project within the allotted cost and time. Taking this into thought, time and price overrun is one among the most important issues in Indian road project. The foremost necessary causes for overrun were delayed to furnish and deliver the location, financial issues, and improper designing. Whereas the foremost necessary causes of cost overrun were found to be a delay in construction, inadequate provision of raw materials and Instruments by contractors, improper planning, incomplete design. Therefore, this analysis was administered to know such issues and to resolve such overrun of time and cost by implementing fast tracking techniques. Fast tracking is one of project management methodology. It has a very important use and purpose - to deliver on time, on budget activities even once one or additional limiting constraints substitute the method of success. Fast tracking could be a specialized management approach - to be used whenever you’re asked to deliver over existing capabilities enable and you would like a regular way to place things back in balance.

Citations

Copy and paste a formatted citation or use one of the links to import into a bibliography manager and reference.

IJARIIE Kiran B Chougala, and Amey Kelkar. "APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION" International Journal Of Advance Research And Innovative Ideas In Education Volume 3 Issue 4 2017 Page 2045-2049
MLA Kiran B Chougala, and Amey Kelkar. "APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION." International Journal Of Advance Research And Innovative Ideas In Education 3.4(2017) : 2045-2049.
APA Kiran B Chougala, & Amey Kelkar. (2017). APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION. International Journal Of Advance Research And Innovative Ideas In Education, 3(4), 2045-2049.
Chicago Kiran B Chougala, and Amey Kelkar. "APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION." International Journal Of Advance Research And Innovative Ideas In Education 3, no. 4 (2017) : 2045-2049.
Oxford Kiran B Chougala, and Amey Kelkar. 'APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION', International Journal Of Advance Research And Innovative Ideas In Education, vol. 3, no. 4, 2017, p. 2045-2049. Available from IJARIIE, http://ijariie.com/AdminUploadPdf/APPLICATION_OF_FAST_TRACKING_TECHNIQUES_TO_OVERCOME_TIME___COST_OVERRUNS_IN_CONSTRUCTION_ijariie6255.pdf (Accessed : 29 August 2017).
Harvard Kiran B Chougala, and Amey Kelkar. (2017) 'APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION', International Journal Of Advance Research And Innovative Ideas In Education, 3(4), pp. 2045-2049IJARIIE [Online]. Available at: http://ijariie.com/AdminUploadPdf/APPLICATION_OF_FAST_TRACKING_TECHNIQUES_TO_OVERCOME_TIME___COST_OVERRUNS_IN_CONSTRUCTION_ijariie6255.pdf (Accessed : 29 August 2017)
IEEE Kiran B Chougala, and Amey Kelkar, "APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION," International Journal Of Advance Research And Innovative Ideas In Education, vol. 3, no. 4, pp. 2045-2049, Jul-Aug 2017. [Online]. Available: http://ijariie.com/AdminUploadPdf/APPLICATION_OF_FAST_TRACKING_TECHNIQUES_TO_OVERCOME_TIME___COST_OVERRUNS_IN_CONSTRUCTION_ijariie6255.pdf [Accessed : 29 August 2017].
Turabian Kiran B Chougala, and Amey Kelkar. "APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION." International Journal Of Advance Research And Innovative Ideas In Education [Online]. volume 3 number 4 (29 August 2017).
Vancouver Kiran B Chougala, and Amey Kelkar. APPLICATION OF FAST TRACKING TECHNIQUES TO OVERCOME TIME & COST OVERRUNS IN CONSTRUCTION. International Journal Of Advance Research And Innovative Ideas In Education [Internet]. 2017 [Cited : 29 August 2017]; 3(4) : 2045-2049. Available from: http://ijariie.com/AdminUploadPdf/APPLICATION_OF_FAST_TRACKING_TECHNIQUES_TO_OVERCOME_TIME___COST_OVERRUNS_IN_CONSTRUCTION_ijariie6255.pdf
BibTex EndNote RefMan RefWorks

Number Of Downloads


Last download on 8/29/2017 12:04:20 AM

Save in Google Drive

Similar-Paper

TitleArea of ResearchAuther NameAction
ENHANCING THEORETICAL LEARNING IN ENGINEERING EDUCATION THROUGH AUGMENTED REALITYCIVIL ENGINEERING FELIX BIKETI Download
AUGMENTED REALITY AS A TOOL FOR PRACTICAL SKILLS DEVELOPMENT IN BUILDING AND CIVIL ENGINEERING PROGRAMMESCIVIL ENGINEERING FELIX BIKETI Download
EXPERIMENTAL INVESTIGATION AND ANALYSIS OF BAMBOO FRAMECIVIL ENGINEERINGMAHESWARI K Download
PARTIAL REPLACEMENT OF CEMENT USING SUGARCANE BAGGASE ASH TO ENCHANCE THE STRENGTH OF CONCRETECivil EngineeringDhanraj Balu Vitekar Download
HEC-RAS BASED HYDRAULIC MODELING OF PUS RIVER FOR FLOOD MANAGEMENTCivil Engineering Kunal D Manwar Download
Sewage water treatment plantCivil engineeringBhoopesh Ghorse Download
To increase the compressive strength of concrete by replacing fine aggregate with shredded steel wasteCivil EngineeringChandan Kumar Download
Analysis and Design of E-Waste Management: Enhancing Concrete with Recycled E-Wastecivil Engineering Palak Tomar Download
SUBGRADE STABILIZATION OF EXPANSIVE SOIL USING LIQUID POLYMERCivil engineering Deepak Singh Download
Study of Physical Characteristics of Self-healing ConcreteCivil EngineeringAbhay Singh Download
Purification of textile waste waterCivil engineering Satendra Mishra Download
STABILISATION OF BLACK COTTON SOIL USING HUMAN HAIR AND GYPSUMCIVIL ENGINEERINGDHEERAJ KUMAR PATEL Download
STUDY ON DESIGN SEWAGE TREATMENT PLANTSTUDY ON DESIGN SEWAGE TREATMENT PLANTShriyansh soni Download
Study On Strength Of Concrete By Using Recycled Aggregate From Demolished Waste In Concretecivil EngineeringSumit Kumar Download
Risk Management and Delay Mitigation in Construction Projects: A Comprehensive Literature ReviewCivil EngineeringRamana V Download
12
For Authors
  • Submit Paper
  • Processing Charges
  • Submit Payment
Archive
  • Current Issue
  • Past Issue
IJARIIE Board
  • Member Of Board
  • Join As Board
Privacy and Policy
Follow us

Contact Info
  • +91-8401209201 (India)
  • +86-15636082010 (China)
  • ijariiejournal@gmail.com
  • M-20/234 Ami Appt,
    Nr.Naranpura Tele-Exch,
    Naranpura,
    Ahemdabad-380063
    Gujarat,India.
Copyright © 2025. IJARIIE. All Rights Reserved.