Logo
  • Home
  • About Us
    • Aim and Scope
    • Research Area
    • Impact Factor
    • Indexing
  • For Authors
    • Authors Guidelines
    • How to publish paper?
    • Download Paper format
    • Submit Manuscript
    • Processing Charges
    • Download Copyrights Form
    • Submit Payment-Copyrights
  • Archives
    • Current Issues
    • Past Issues
    • Conference Issues
    • Special Issues
    • Advance Search
  • IJARIIE Board
    • Join as IJARIIE Board
    • Advisory Board
    • Editorial Board
    • Sr. Reviewer Board
    • Jr. Reviewer Board
  • Proposal
    • Conferece Proposal
    • Special Proposal
    • Faqs
  • Contact Us
  • Payment Detail

Call for Papers:Vol.8 Issue.4

Submission
Last date
31-Aug-2022
Acceptance Status In One Day
Paper Publish In Two Days
Submit ManuScript

News & Updates

Submit Article

Dear Authors, Article publish in our journal for Volume-8,Issue-4. For article submission on below link: Submit Manuscript


Join As Board

Dear Reviewer, You can join our Reviewer team without given any charges in our journal. Submit Details on below link: Join As Board


Paper Publication Charges

IJARIIE APP
Download Android App

For Authors

  • How to Publish Paper
  • Submit Manuscript
  • Processing Charges
  • Submit Payment

Archives

  • Current Issue
  • Past Issue

IJARIIE Board

  • Member Of Board
  • Join As Board

Downloads

  • Authors Guidelines
  • Manuscript Template
  • Copyrights Form

Android App

Download IJARIIE APP
  • Authors
  • Abstract
  • Citations
  • Downloads
  • Similar-Paper

Authors

Title: :  Time and Cost Optimization in project excution
PaperId: :  6336
Published in:   International Journal Of Advance Research And Innovative Ideas In Education
Publisher:   IJARIIE
e-ISSN:   2395-4396
Volume/Issue:    Volume 3 Issue 4 2017
DUI:    16.0415/IJARIIE-6336
Licence: :   IJARIIE is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Author NameAuthor Institute
Shamsul Haque HamidullahAl-FALAH UNIVERSITY

Abstract

Civil Engineering
critical path method, crashing, cost optimization, cost.
The main objective in the field of construction is to complete every project on time, within budget and quality full. The requirements of construction management are the useful utility, structural firmness, economy, speed, and quality of construction. In the every construction project time and cost trade-off are two important factors. It is crucial in achieving the project objectives. Dealing with different conflicting facets of the project is one of the challenging problems which often Construction Company has to face. Time loss is always costly and time-saving can provide profit to all the parties in the project. There is always a mutual affinity between time and cost. Time cost optimization is necessary and very important for a construction project. The objective of time cost optimization is to determine optimum project duration corresponding to the minimum total cost and this can be achieved with help of reducing the duration of critical activities in the network in order by breaking the activities of critical activities to minimize the overall project duration. In this study, critical path method (CPM) with an investigative method is used to find out the crash duration and crash cost and. An analysis is performed to identify the relationship between the time and cost in order to formalize an optimization problem model. In the analysis part, for this problem solving will be performed by manual methods. Then the reasons are introduced to increase the duration of project, then through project crashing technique optimisation of time and cost will be easy early completion of project applying this approach the obtained result is satisfactory, that is an indication of usefulness of this approach in construction project management problems, a numerical example in the paper shows the advantage of the proposed approach.

Citations

Copy and paste a formatted citation or use one of the links to import into a bibliography manager and reference.

IJARIIE Shamsul Haque Hamidullah. "Time and Cost Optimization in project excution" International Journal Of Advance Research And Innovative Ideas In Education Volume 3 Issue 4 2017 Page 2491-2497
MLA Shamsul Haque Hamidullah. "Time and Cost Optimization in project excution." International Journal Of Advance Research And Innovative Ideas In Education 3.4(2017) : 2491-2497.
APA Shamsul Haque Hamidullah. (2017). Time and Cost Optimization in project excution. International Journal Of Advance Research And Innovative Ideas In Education, 3(4), 2491-2497.
Chicago Shamsul Haque Hamidullah. "Time and Cost Optimization in project excution." International Journal Of Advance Research And Innovative Ideas In Education 3, no. 4 (2017) : 2491-2497.
Oxford Shamsul Haque Hamidullah. 'Time and Cost Optimization in project excution', International Journal Of Advance Research And Innovative Ideas In Education, vol. 3, no. 4, 2017, p. 2491-2497. Available from IJARIIE, http://ijariie.com/AdminUploadPdf/Time_and_Cost_Optimization_in_project_excution_ijariie6336.pdf (Accessed : 14 August 2017).
Harvard Shamsul Haque Hamidullah. (2017) 'Time and Cost Optimization in project excution', International Journal Of Advance Research And Innovative Ideas In Education, 3(4), pp. 2491-2497IJARIIE [Online]. Available at: http://ijariie.com/AdminUploadPdf/Time_and_Cost_Optimization_in_project_excution_ijariie6336.pdf (Accessed : 14 August 2017)
IEEE Shamsul Haque Hamidullah, "Time and Cost Optimization in project excution," International Journal Of Advance Research And Innovative Ideas In Education, vol. 3, no. 4, pp. 2491-2497, Jul-Aug 2017. [Online]. Available: http://ijariie.com/AdminUploadPdf/Time_and_Cost_Optimization_in_project_excution_ijariie6336.pdf [Accessed : 14 August 2017].
Turabian Shamsul Haque Hamidullah. "Time and Cost Optimization in project excution." International Journal Of Advance Research And Innovative Ideas In Education [Online]. volume 3 number 4 (14 August 2017).
Vancouver Shamsul Haque Hamidullah. Time and Cost Optimization in project excution. International Journal Of Advance Research And Innovative Ideas In Education [Internet]. 2017 [Cited : 14 August 2017]; 3(4) : 2491-2497. Available from: http://ijariie.com/AdminUploadPdf/Time_and_Cost_Optimization_in_project_excution_ijariie6336.pdf
BibTex EndNote RefMan RefWorks

Number Of Downloads


Last download on 8/14/2017 2:31:35 PM

Save in Google Drive

Similar-Paper

TitleArea of ResearchAuther NameAction
ANALYSIS OF DELAY IN CONSTRUCTION PROJECT IN INDIACIVIL ENGINEERINGADITYA JOSEPH Download
STUDY OF CANAL LINING AND CANAL SEEPAGE USING HDPE SHEET FOR NIRA DEOGHAR CANAL, BHORCivil EngineeringTanmay Kiran Shirodkar Download
ESTIMATION OF WATER DEMAND AND RAINWATER HARVESTING POTENTIAL IN THE CAMPUS OF SHRI SIDDARAMESHWAR EDUCATION TRUST BELAGAVICIVIL ENGINEERINGMegha M. Pattar Download
REVIEW ON DYNAMIC ANALYSIS OF PSC T BEAM & BOX GIRDER BRIDGESUPERSTRUCTURE FOR DIFFERENT SPAN LENGTHSCivil EngineeringGambhire Vikas Arunrao Download
A STUDY ON LOW COST RIGID PAVEMENT USING HYPO SLUDGE WASTE FROM PAPER INDUSTRYCIVIL ENGINEERINGASHWINI N MUSALI Download
A Study on Road Traffic Accident Scenario of BangladeshCivil EngineeringEngr. A.S.M. Mohsin, Ph. D. Download
Causes of Work Variation: A Case Study in Wolaita Sodo University Construction SitesCONSTRUCTION MANAGEMENTHenok Teshome Jima Download
ANALYSIS OF BEAM COLUMN JOINT SUBJECTED TO SEISMIC LATERAL LOADINGDepartment of Civil EngineeringMs. Shubhangi Balaji Dalave Download
MULTIPLE-STORY BUILDING WITH AND WITHOUT A FLOATING COLUMN: A COMPARATIVE STUDYDepartment of Civil EngineeringMs. Rawale Pradnya Balaji Download
STRENGTHENING AND EVALUATING OF BLACK COTTON SOIL BY USING RBI GRADE 81 AND LIMECIVIL ENGINEERINGVipin Kumar Pal Download
EXPERIMENTAL INVESTIGATION ON CONCRETE BY USING SUPER ABSORBING POLYMERcivil enfineeringPrachi Chavhan Download
EXPERIMENTAL INVESTIGATION ON M 20 GRADE OF CONCRETE INCOPERATED WITH ALCCOFINECIVIL ENGINEERINGSHIVAM SINGH BAGHEL Download
AN EXPERIMENTAL INVESTIGATION ON M-30 GRADE OF CONCRETE INCOPERATED WITH COLLOIDAL NANO-SILICA AND POLYPROPYLENE FIBERCIVIL ENGINEERINGPANKAJ SINGH Download
Wastewater Treatment Using Bio-Coagulant as Cactus Opuntia Ficus lndicaCivil Engineering Nidhi Kurhade Download
COMPARATIVE STUDY OF METHODS OF VALUATION WITH RESPECT TO CASE STUDYCivil EngineeringMr. Mangalesh Dipak Vinchurkar Download
12
For Authors
  • Submit Paper
  • Processing Charges
  • Submit Payment
Archive
  • Current Issue
  • Past Issue
IJARIIE Board
  • Member Of Board
  • Join As Board
Privacy and Policy
Follow us

Contact Info
  • +91-8401209201 (India)
  • +86-15636082010 (China)
  • ijariiejournal@gmail.com
  • M-20/234 Ami Appt,
    Nr.Naranpura Tele-Exch,
    Naranpura,
    Ahemdabad-380063
    Gujarat,India.
Copyright © 2022. IJARIIE. All Rights Reserved.