Logo
  • Home
  • About Us
    • Aim and Scope
    • Research Area
    • Impact Factor
    • Indexing
  • For Authors
    • Authors Guidelines
    • How to publish paper?
    • Download Paper format
    • Submit Manuscript
    • Processing Charges
    • Download Copyrights Form
    • Submit Payment-Copyrights
  • Archives
    • Current Issues
    • Past Issues
    • Conference Issues
    • Special Issues
    • Advance Search
  • IJARIIE Board
    • Join as IJARIIE Board
    • Advisory Board
    • Editorial Board
    • Sr. Reviewer Board
    • Jr. Reviewer Board
  • Proposal
    • Conferece Proposal
    • Special Proposal
    • Faqs
  • Contact Us
  • Payment Detail

Call for Papers:Vol.8 Issue.4

Submission
Last date
31-Aug-2022
Acceptance Status In One Day
Paper Publish In Two Days
Submit ManuScript

News & Updates

Submit Article

Dear Authors, Article publish in our journal for Volume-8,Issue-4. For article submission on below link: Submit Manuscript


Join As Board

Dear Reviewer, You can join our Reviewer team without given any charges in our journal. Submit Details on below link: Join As Board


Paper Publication Charges

IJARIIE APP
Download Android App

For Authors

  • How to Publish Paper
  • Submit Manuscript
  • Processing Charges
  • Submit Payment

Archives

  • Current Issue
  • Past Issue

IJARIIE Board

  • Member Of Board
  • Join As Board

Downloads

  • Authors Guidelines
  • Manuscript Template
  • Copyrights Form

Android App

Download IJARIIE APP
  • Authors
  • Abstract
  • Citations
  • Downloads
  • Similar-Paper

Authors

Title: :  ANALYSIS OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECT USING SMART-PLS
PaperId: :  6983
Published in:   International Journal Of Advance Research And Innovative Ideas In Education
Publisher:   IJARIIE
e-ISSN:   2395-4396
Volume/Issue:    Volume 3 Issue 6 2017
DUI:    16.0415/IJARIIE-6983
Licence: :   IJARIIE is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Author NameAuthor Institute
Patel Harjinder RameshMIT Art, Design and Technology University, Pune
Patel Saurabh AshwinMIT Art, Design and Technology University, Pune
Mehta Nirav BipinbhaiMIT Art, Design and Technology University, Pune
Desai Mit MihirMIT Art, Design and Technology University, Pune

Abstract

Civil Engineering
Overrun, Delay, Cost overrun, Time overrun, Smart PLS, Partial least square.
Infrastructure projects regularly experience cost and schedule overruns. Unfortunately construction industry today is facing major risk in achieving completion of project within estimated time and cost. Total 37 factors affecting cost and time overrun were categorized in 5 major groups. After consideration of factors and ranking them with the help of questionnaire survey, the data has been analysed using Smart PLS software. In software analysis by Smart PLS, the coefficient of determination, R^2, is 0.496 for the Cost Overrun endogenous latent variable and similarly for time overrun, the coefficient of determination, R^2, is 0.60 for the Time Overrun endogenous latent variable. This study also suggest that assurance of Funds Resources, availability of good quality construction material, owners quick response and many others will help to control the identified risk factors. It is hoped that finding of this paper will help the stakeholders to act on critical causes and further to reduce cost and time overrun in construction project.

Citations

Copy and paste a formatted citation or use one of the links to import into a bibliography manager and reference.

IJARIIE Patel Harjinder Ramesh, Patel Saurabh Ashwin, Mehta Nirav Bipinbhai, and Desai Mit Mihir. "ANALYSIS OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECT USING SMART-PLS" International Journal Of Advance Research And Innovative Ideas In Education Volume 3 Issue 6 2017 Page 552-561
MLA Patel Harjinder Ramesh, Patel Saurabh Ashwin, Mehta Nirav Bipinbhai, and Desai Mit Mihir. "ANALYSIS OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECT USING SMART-PLS." International Journal Of Advance Research And Innovative Ideas In Education 3.6(2017) : 552-561.
APA Patel Harjinder Ramesh, Patel Saurabh Ashwin, Mehta Nirav Bipinbhai, & Desai Mit Mihir. (2017). ANALYSIS OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECT USING SMART-PLS. International Journal Of Advance Research And Innovative Ideas In Education, 3(6), 552-561.
Chicago Patel Harjinder Ramesh, Patel Saurabh Ashwin, Mehta Nirav Bipinbhai, and Desai Mit Mihir. "ANALYSIS OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECT USING SMART-PLS." International Journal Of Advance Research And Innovative Ideas In Education 3, no. 6 (2017) : 552-561.
Oxford Patel Harjinder Ramesh, Patel Saurabh Ashwin, Mehta Nirav Bipinbhai, and Desai Mit Mihir. 'ANALYSIS OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECT USING SMART-PLS', International Journal Of Advance Research And Innovative Ideas In Education, vol. 3, no. 6, 2017, p. 552-561. Available from IJARIIE, http://ijariie.com/AdminUploadPdf/ANALYSIS_OF_COST_AND_TIME_OVERRUN_IN_CONSTRUCTION_PROJECT_USING_SMART_PLS_ijariie6983.pdf (Accessed : 03 June 2018).
Harvard Patel Harjinder Ramesh, Patel Saurabh Ashwin, Mehta Nirav Bipinbhai, and Desai Mit Mihir. (2017) 'ANALYSIS OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECT USING SMART-PLS', International Journal Of Advance Research And Innovative Ideas In Education, 3(6), pp. 552-561IJARIIE [Online]. Available at: http://ijariie.com/AdminUploadPdf/ANALYSIS_OF_COST_AND_TIME_OVERRUN_IN_CONSTRUCTION_PROJECT_USING_SMART_PLS_ijariie6983.pdf (Accessed : 03 June 2018)
IEEE Patel Harjinder Ramesh, Patel Saurabh Ashwin, Mehta Nirav Bipinbhai, and Desai Mit Mihir, "ANALYSIS OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECT USING SMART-PLS," International Journal Of Advance Research And Innovative Ideas In Education, vol. 3, no. 6, pp. 552-561, Nov-Dec 2017. [Online]. Available: http://ijariie.com/AdminUploadPdf/ANALYSIS_OF_COST_AND_TIME_OVERRUN_IN_CONSTRUCTION_PROJECT_USING_SMART_PLS_ijariie6983.pdf [Accessed : 03 June 2018].
Turabian Patel Harjinder Ramesh, Patel Saurabh Ashwin, Mehta Nirav Bipinbhai, and Desai Mit Mihir. "ANALYSIS OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECT USING SMART-PLS." International Journal Of Advance Research And Innovative Ideas In Education [Online]. volume 3 number 6 (03 June 2018).
Vancouver Patel Harjinder Ramesh, Patel Saurabh Ashwin, Mehta Nirav Bipinbhai, and Desai Mit Mihir. ANALYSIS OF COST AND TIME OVERRUN IN CONSTRUCTION PROJECT USING SMART-PLS. International Journal Of Advance Research And Innovative Ideas In Education [Internet]. 2017 [Cited : 03 June 2018]; 3(6) : 552-561. Available from: http://ijariie.com/AdminUploadPdf/ANALYSIS_OF_COST_AND_TIME_OVERRUN_IN_CONSTRUCTION_PROJECT_USING_SMART_PLS_ijariie6983.pdf
BibTex EndNote RefMan RefWorks

Number Of Downloads


Last download on 6/3/2018 8:57:06 AM

Save in Google Drive

Similar-Paper

TitleArea of ResearchAuther NameAction
ANALYSIS OF DELAY IN CONSTRUCTION PROJECT IN INDIACIVIL ENGINEERINGADITYA JOSEPH Download
STUDY OF CANAL LINING AND CANAL SEEPAGE USING HDPE SHEET FOR NIRA DEOGHAR CANAL, BHORCivil EngineeringTanmay Kiran Shirodkar Download
ESTIMATION OF WATER DEMAND AND RAINWATER HARVESTING POTENTIAL IN THE CAMPUS OF SHRI SIDDARAMESHWAR EDUCATION TRUST BELAGAVICIVIL ENGINEERINGMegha M. Pattar Download
REVIEW ON DYNAMIC ANALYSIS OF PSC T BEAM & BOX GIRDER BRIDGESUPERSTRUCTURE FOR DIFFERENT SPAN LENGTHSCivil EngineeringGambhire Vikas Arunrao Download
A STUDY ON LOW COST RIGID PAVEMENT USING HYPO SLUDGE WASTE FROM PAPER INDUSTRYCIVIL ENGINEERINGASHWINI N MUSALI Download
A Study on Road Traffic Accident Scenario of BangladeshCivil EngineeringEngr. A.S.M. Mohsin, Ph. D. Download
Causes of Work Variation: A Case Study in Wolaita Sodo University Construction SitesCONSTRUCTION MANAGEMENTHenok Teshome Jima Download
ANALYSIS OF BEAM COLUMN JOINT SUBJECTED TO SEISMIC LATERAL LOADINGDepartment of Civil EngineeringMs. Shubhangi Balaji Dalave Download
MULTIPLE-STORY BUILDING WITH AND WITHOUT A FLOATING COLUMN: A COMPARATIVE STUDYDepartment of Civil EngineeringMs. Rawale Pradnya Balaji Download
STRENGTHENING AND EVALUATING OF BLACK COTTON SOIL BY USING RBI GRADE 81 AND LIMECIVIL ENGINEERINGVipin Kumar Pal Download
EXPERIMENTAL INVESTIGATION ON CONCRETE BY USING SUPER ABSORBING POLYMERcivil enfineeringPrachi Chavhan Download
EXPERIMENTAL INVESTIGATION ON M 20 GRADE OF CONCRETE INCOPERATED WITH ALCCOFINECIVIL ENGINEERINGSHIVAM SINGH BAGHEL Download
AN EXPERIMENTAL INVESTIGATION ON M-30 GRADE OF CONCRETE INCOPERATED WITH COLLOIDAL NANO-SILICA AND POLYPROPYLENE FIBERCIVIL ENGINEERINGPANKAJ SINGH Download
Wastewater Treatment Using Bio-Coagulant as Cactus Opuntia Ficus lndicaCivil Engineering Nidhi Kurhade Download
COMPARATIVE STUDY OF METHODS OF VALUATION WITH RESPECT TO CASE STUDYCivil EngineeringMr. Mangalesh Dipak Vinchurkar Download
12
For Authors
  • Submit Paper
  • Processing Charges
  • Submit Payment
Archive
  • Current Issue
  • Past Issue
IJARIIE Board
  • Member Of Board
  • Join As Board
Privacy and Policy
Follow us

Contact Info
  • +91-8401209201 (India)
  • +86-15636082010 (China)
  • ijariiejournal@gmail.com
  • M-20/234 Ami Appt,
    Nr.Naranpura Tele-Exch,
    Naranpura,
    Ahemdabad-380063
    Gujarat,India.
Copyright © 2022. IJARIIE. All Rights Reserved.