Logo
  • Home
  • About Us
    • Aim and Scope
    • Research Area
    • Impact Factor
    • Indexing
  • For Authors
    • Authors Guidelines
    • How to publish paper?
    • Download Paper format
    • Submit Manuscript
    • Processing Charges
    • Download Copyrights Form
    • Submit Payment-Copyrights
  • Archives
    • Current Issues
    • Past Issues
    • Conference Issues
    • Special Issues
    • Advance Search
  • IJARIIE Board
    • Join as IJARIIE Board
    • Advisory Board
    • Editorial Board
    • Sr. Reviewer Board
    • Jr. Reviewer Board
  • Proposal
    • Conferece Proposal
    • Special Proposal
    • Faqs
  • Contact Us
  • Payment Detail

Call for Papers:Vol.11 Issue.3

Submission
Last date
28-Jun-2025
Acceptance Status In One Day
Paper Publish In Two Days
Submit ManuScript

News & Updates

Submit Article

Dear Authors, Article publish in our journal for Volume-11,Issue-3. For article submission on below link: Submit Manuscript


Join As Board

Dear Reviewer, You can join our Reviewer team without given any charges in our journal. Submit Details on below link: Join As Board


Paper Publication Charges

IJARIIE APP
Download Android App

For Authors

  • How to Publish Paper
  • Submit Manuscript
  • Processing Charges
  • Submit Payment

Archives

  • Current Issue
  • Past Issue

IJARIIE Board

  • Member Of Board
  • Join As Board

Downloads

  • Authors Guidelines
  • Manuscript Template
  • Copyrights Form

Android App

Download IJARIIE APP
  • Authors
  • Abstract
  • Citations
  • Downloads
  • Similar-Paper

Authors

Title: :  Study on Project Schedule and Cost Overruns
PaperId: :  8150
Published in:   International Journal Of Advance Research And Innovative Ideas In Education
Publisher:   IJARIIE
e-ISSN:   2395-4396
Volume/Issue:    Volume 4 Issue 2 2018
DUI:    16.0415/IJARIIE-8150
Licence: :   IJARIIE is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Author NameAuthor Institute
Saurabh PatelMIT COLLEGE OF MANAGAMENT, Pune
Harjinder PatelMIT COLLEGE OF MANAGAMENT, Pune

Abstract

Civil Engineering
Risk Factors, overrun, Delay, Cost overrun, Construction projects, Time overrun.
Risk plays an important role in the success of construction project. In managing risk, identification of risk factors is very critical. Hence, this study focused on the investigation of risk factors from contractors’ perspective as the contractors are key players in the success of a project. Investigations on the risk factor involved 35 common risk factors classified in five categories and ranking them with the help of questionnaire survey. The data has been Theoretical analysed by following techniques:- Frequency Index, Severity Index, Importance Index and Relative Importance Index. Results found that the five most important risk factors in construction project are escalation in price of material, changes in government regulations and laws, shortages of materials and equipment’s, cash flow and financial difficulties. Method developed in this study can help agencies and hence estimation of expected overruns of final cost and delay in completion time for their planned project. The findings of this study would assist in dealing with risks encountered in construction projects.

Citations

Copy and paste a formatted citation or use one of the links to import into a bibliography manager and reference.

IJARIIE Saurabh Patel, and Harjinder Patel. "Study on Project Schedule and Cost Overruns" International Journal Of Advance Research And Innovative Ideas In Education Volume 4 Issue 2 2018 Page 3440-3453
MLA Saurabh Patel, and Harjinder Patel. "Study on Project Schedule and Cost Overruns." International Journal Of Advance Research And Innovative Ideas In Education 4.2(2018) : 3440-3453.
APA Saurabh Patel, & Harjinder Patel. (2018). Study on Project Schedule and Cost Overruns. International Journal Of Advance Research And Innovative Ideas In Education, 4(2), 3440-3453.
Chicago Saurabh Patel, and Harjinder Patel. "Study on Project Schedule and Cost Overruns." International Journal Of Advance Research And Innovative Ideas In Education 4, no. 2 (2018) : 3440-3453.
Oxford Saurabh Patel, and Harjinder Patel. 'Study on Project Schedule and Cost Overruns', International Journal Of Advance Research And Innovative Ideas In Education, vol. 4, no. 2, 2018, p. 3440-3453. Available from IJARIIE, http://ijariie.com/AdminUploadPdf/Study_on_Project_Schedule_and_Cost_Overruns_ijariie8150.pdf (Accessed : ).
Harvard Saurabh Patel, and Harjinder Patel. (2018) 'Study on Project Schedule and Cost Overruns', International Journal Of Advance Research And Innovative Ideas In Education, 4(2), pp. 3440-3453IJARIIE [Online]. Available at: http://ijariie.com/AdminUploadPdf/Study_on_Project_Schedule_and_Cost_Overruns_ijariie8150.pdf (Accessed : )
IEEE Saurabh Patel, and Harjinder Patel, "Study on Project Schedule and Cost Overruns," International Journal Of Advance Research And Innovative Ideas In Education, vol. 4, no. 2, pp. 3440-3453, Mar-App 2018. [Online]. Available: http://ijariie.com/AdminUploadPdf/Study_on_Project_Schedule_and_Cost_Overruns_ijariie8150.pdf [Accessed : ].
Turabian Saurabh Patel, and Harjinder Patel. "Study on Project Schedule and Cost Overruns." International Journal Of Advance Research And Innovative Ideas In Education [Online]. volume 4 number 2 ().
Vancouver Saurabh Patel, and Harjinder Patel. Study on Project Schedule and Cost Overruns. International Journal Of Advance Research And Innovative Ideas In Education [Internet]. 2018 [Cited : ]; 4(2) : 3440-3453. Available from: http://ijariie.com/AdminUploadPdf/Study_on_Project_Schedule_and_Cost_Overruns_ijariie8150.pdf
BibTex EndNote RefMan RefWorks

Number Of Downloads



Save in Google Drive

Similar-Paper

TitleArea of ResearchAuther NameAction
PARTIAL REPLACEMENT OF CEMENT USING SUGARCANE BAGGASE ASH TO ENCHANCE THE STRENGTH OF CONCRETECivil EngineeringDhanraj Balu Vitekar Download
HEC-RAS BASED HYDRAULIC MODELING OF PUS RIVER FOR FLOOD MANAGEMENTCivil Engineering Kunal D Manwar Download
Sewage water treatment plantCivil engineeringBhoopesh Ghorse Download
To increase the compressive strength of concrete by replacing fine aggregate with shredded steel wasteCivil EngineeringChandan Kumar Download
Analysis and Design of E-Waste Management: Enhancing Concrete with Recycled E-Wastecivil Engineering Palak Tomar Download
SUBGRADE STABILIZATION OF EXPANSIVE SOIL USING LIQUID POLYMERCivil engineering Deepak Singh Download
Study of Physical Characteristics of Self-healing ConcreteCivil EngineeringAbhay Singh Download
Purification of textile waste waterCivil engineering Satendra Mishra Download
STABILISATION OF BLACK COTTON SOIL USING HUMAN HAIR AND GYPSUMCIVIL ENGINEERINGDHEERAJ KUMAR PATEL Download
STUDY ON DESIGN SEWAGE TREATMENT PLANTSTUDY ON DESIGN SEWAGE TREATMENT PLANTShriyansh soni Download
Study On Strength Of Concrete By Using Recycled Aggregate From Demolished Waste In Concretecivil EngineeringSumit Kumar Download
Risk Management and Delay Mitigation in Construction Projects: A Comprehensive Literature ReviewCivil EngineeringRamana V Download
Research Paper on Smart Construction Materials With Final ResultCivil EngineeringSHITALKUMAR N.DESHMUKH Download
Experimental Study of M-20 Grade Concrete Using Packing Density Method.EngineeringMr. G. P. Walhekar Download
Experimental Study of Watershed Management Structure in rural area.EngineeringMr. S K Gorde Download
12
For Authors
  • Submit Paper
  • Processing Charges
  • Submit Payment
Archive
  • Current Issue
  • Past Issue
IJARIIE Board
  • Member Of Board
  • Join As Board
Privacy and Policy
Follow us

Contact Info
  • +91-8401209201 (India)
  • +86-15636082010 (China)
  • ijariiejournal@gmail.com
  • M-20/234 Ami Appt,
    Nr.Naranpura Tele-Exch,
    Naranpura,
    Ahemdabad-380063
    Gujarat,India.
Copyright © 2025. IJARIIE. All Rights Reserved.