DELAY IN CONSTRUCTION PROJECT
Abstract & Details
Research Area
CIVIL ENGINEERING
Keywords
CONSTRUCTION
DELAY
PROJECT
METHODOLOGY
SURVEY
QUESTIONNAIRE
TYPE OF DELAY
CAUSES
EFFECTS.
Abstract
Construction delay is a time exceeds either after the contract date or after the date that the components involved have agreed upon for the delivery of the project. In both cases, a delay is usually a costly situation or the period of amount of time during which something is delayed. There is various types of definition of delay are made in construction industry such as to wait until later to do something or to take longer than expected or planned or the amount of time that you must wait for something that is late. Delay are the major source of claim and disputes in construction industry in India. Various delayed analysis methods have been developed, there is a lot of debate was arranged on national and international level for how to minimize delays. This paper has intended to identify the causes of delays, the effects of delays and methods of minimizing construction delays. This paper study has carried out based on literature review and a questionnaire survey. The eighty-three questionnaire has been made on the basis of pilot study, which has been distributed on various construction site. Interview has been taken on each construction sites, also take photos of any ongoing activity on that site. Then ranked on their importance index by the data collection in India. For major factor analysis has used to reduce all factors divided into nine groups: project, clients, consultants, contractors, designer, equipment, labour, external and material.
Recommendation has been made for improve project management, improve cash flow by client so as to reduce payment delays and also more some suggestions are made by top ten major factors, which has been included on report. The result of this paper should help construction practitioners, policy makers and researchers in construction field.
Key Words:Construction Management, Causes of Delays, Effects of Delays, Construction Industry, India.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | MOHD DANISH | AL-FALAH UNIVERSITY |
| 2 | ABDUL AHAD | MOHAMMAD ALI JAUHAR |
| 3 | DR. SYED KHURSHEED AHMAD | AL-FALAH UNIVERSITY |
How to Cite
Use the following formats to cite this article in your research.
APA Style
DANISH, MOHD, AHAD, ABDUL, & AHMAD, DR. SYED KHURSHEED (2019). DELAY IN CONSTRUCTION PROJECT. International Journal of Advance Research and Innovative Ideas In Education, 5(4), 256-272.
MLA Style
DANISH, MOHD, et al. "DELAY IN CONSTRUCTION PROJECT." International Journal of Advance Research and Innovative Ideas In Education, vol. 5, no. 4, 2019, pp. 256-272.
IEEE Style
MOHD DANISH, ABDUL AHAD, and DR. SYED KHURSHEED AHMAD, "DELAY IN CONSTRUCTION PROJECT," International Journal of Advance Research and Innovative Ideas In Education, vol. 5, no. 4, pp. 256-272, 2019.
Vancouver Style
DANISH MOHD, AHAD ABDUL, AHMAD DR. SYED KHURSHEED. DELAY IN CONSTRUCTION PROJECT. International Journal of Advance Research and Innovative Ideas In Education. 2019;5(4):256-272.
Harvard Style
DANISH, MOHD, AHAD, ABDUL, & AHMAD, DR. SYED KHURSHEED (2019) 'DELAY IN CONSTRUCTION PROJECT', International Journal of Advance Research and Innovative Ideas In Education, 5(4), pp. 256-272.
Chicago Style
DANISH, MOHD, ABDUL AHAD, and DR. SYED KHURSHEED AHMAD. "DELAY IN CONSTRUCTION PROJECT." International Journal of Advance Research and Innovative Ideas In Education 5, no. 4 (2019): 256-272.
Turabian Style
DANISH, MOHD, ABDUL AHAD, and DR. SYED KHURSHEED AHMAD. "DELAY IN CONSTRUCTION PROJECT." International Journal of Advance Research and Innovative Ideas In Education 5, no. 4 (2019): 256-272.
Related Research
MECHANIZED CONSTRUCTION TO INCREASE PRODUCTIVITY AND REDUCE CONSTRUCTION COST AND DURATION
Download PDF
AI-BASED SMART PARKING SYSTEM: EMPTY PARKING SPACE COUNTING AND DISPLAY FOR PARKING GUIDANCE
Download PDF
INFLUENCE OF CRITICAL SUCCESS FACTORS ON EFFECTIVE DELAY MANAGEMENT IN CONSTRUCTION PROJECTS
Download PDF
USE OF GREEN ENERGY FOR GENERATING ELECTRICITY USING TRANSPARENT SOLAR PANELS IN BUILDING CONSTRUCTIONS
Download PDF
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
Download PDF
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
Download PDF