Modular building – A cost effective solution
Abstract & Details
Research Area
-
Keywords
-
Abstract
Our project aims in reducing the problems acknowledged by labour accommodation for construction purposes. Thereby adopting the method of Modular Building construction. Our model design is a single room for labours at site. We have selected a Cellular Light weight concrete panels as a wall material and cold formed rolled steel as a secondary structural member and Hot rolled steel as primary structural member. The need for modular building is bringing a change in the way the world builds. The following points emphasizes on why modular building can be used. 1. Greener-Less site disturbance, Greater flexibility and reuse, less material waste, improved air quality, Factory controlled process, 2.Faster-Reduced construction schedule, Built to Code with Quality materials. Elimination of Weather Delay. 3. Smarter- Safer Construction, Better Engineered Building, Limitless designed opportunities. 4. Sustainability- Energy efficient, Minimizing transport, health and wellbeing. This structure can also be used in residential, school and hospital buildings making it cost effective.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | Mr.Akash R Lunkad | JSPM's RSCOE, Pune |
| 2 | Mr.Ronak Oswal | JSPM's RSCOE, Pune |
| 3 | Mrs Rini Alaxander | JSPM's RSCOE, Pune |
| 4 | Mr.Aditya Patwardhan | JSPM's RSCOE, Pune |
| 5 | Prof.Joshi | JSPM's RSCOE, Pune |
How to Cite
Use the following formats to cite this article in your research.
APA Style
Lunkad, Mr.Akash R, Oswal, Mr.Ronak, Alaxander, Mrs Rini, Patwardhan, Mr.Aditya, & Prof.Joshi (2020). Modular building – A cost effective solution. International Journal of Advance Research and Innovative Ideas In Education, 6(3), 1383-1392.
MLA Style
Lunkad, Mr.Akash R, et al. "Modular building – A cost effective solution." International Journal of Advance Research and Innovative Ideas In Education, vol. 6, no. 3, 2020, pp. 1383-1392.
IEEE Style
Mr.Akash R Lunkad, Mr.Ronak Oswal, Mrs Rini Alaxander, Mr.Aditya Patwardhan, and Prof.Joshi, "Modular building – A cost effective solution," International Journal of Advance Research and Innovative Ideas In Education, vol. 6, no. 3, pp. 1383-1392, 2020.
Vancouver Style
Lunkad Mr.Akash R, Oswal Mr.Ronak, Alaxander Mrs Rini, Patwardhan Mr.Aditya, Prof.Joshi. Modular building – A cost effective solution. International Journal of Advance Research and Innovative Ideas In Education. 2020;6(3):1383-1392.
Harvard Style
Lunkad, Mr.Akash R, Oswal, Mr.Ronak, Alaxander, Mrs Rini, Patwardhan, Mr.Aditya, & Prof.Joshi (2020) 'Modular building – A cost effective solution', International Journal of Advance Research and Innovative Ideas In Education, 6(3), pp. 1383-1392.
Chicago Style
Lunkad, Mr.Akash R, et al. "Modular building – A cost effective solution." International Journal of Advance Research and Innovative Ideas In Education 6, no. 3 (2020): 1383-1392.
Turabian Style
Lunkad, Mr.Akash R, et al. "Modular building – A cost effective solution." International Journal of Advance Research and Innovative Ideas In Education 6, no. 3 (2020): 1383-1392.
Related Research
MECHANIZED CONSTRUCTION TO INCREASE PRODUCTIVITY AND REDUCE CONSTRUCTION COST AND DURATION
Download PDF
AI-BASED SMART PARKING SYSTEM: EMPTY PARKING SPACE COUNTING AND DISPLAY FOR PARKING GUIDANCE
Download PDF
INFLUENCE OF CRITICAL SUCCESS FACTORS ON EFFECTIVE DELAY MANAGEMENT IN CONSTRUCTION PROJECTS
Download PDF
USE OF GREEN ENERGY FOR GENERATING ELECTRICITY USING TRANSPARENT SOLAR PANELS IN BUILDING CONSTRUCTIONS
Download PDF
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
Download PDF
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
Download PDF