EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT

August 2020
Vol-6, Issue-4
Paper ID: 12533
ISSN: 2395-4396
Downloads: 72
Download PDF

Abstract & Details

Research Area
Engineering
Keywords
Net Present Value (NPV) Break event point (BEP)
Abstract
The government's program by increasing the capacity of the Baubau dock / port is in order to accelerate economic development and overcome the number of ships that are no longer able to accommodate loading and unloading of goods and passengers. Heavy equipment investment in port / dock development work certainly requires a large enough initial capital and a long time to return investment capital, so the research objective of this is to assess the feasibility of investment and the payback period. The decision to invest in heavy equipment in local government projects, in particular the work of constructing a new pier and upgrading the existing pier structure, requires in-depth analysis and studies using the Net Present Value (NPV) method and the Internal Rate of Return (IRR) and the Break Event Point (BEP) as a reference to determine whether a project is feasible or not and the payback period for investment. The conclusion from the results of this study is the excavator investment value of IDR. 1,450,000,000, - with a Net Present Value (NPV) of IDR. 4,282,331.62 is greater than zero (investment worthy) and the value of the Internal Rate of Return (IRR) is 7.07% greater than 7% (feasible for investment). Break event point (BEP) or the excavator investment payback period of 2,816 hours. The conclusion from the results of this study is the excavator investment value of IDR. 1,450,000,000, - with a Net Present Value (NPV) of IDR. 4,282,331.62 is greater than zero (investment worthy) and the value of the Internal Rate of Return (IRR) is 7.07% greater than 7% (feasible for investment). Break event point (BEP) or the excavator investment payback period of 2,816 hours. The conclusion from the results of this study is the excavator investment value of IDR. 1,450,000,000, - with a Net Present Value (NPV) of IDR. 4,282,331.62 is greater than zero (investment worthy) and the value of the Internal Rate of Return (IRR) is 7.07% greater than 7% (feasible for investment). Break event point (BEP) or the excavator investment payback period of 2,816 hours.

Author Information

# Name Institute / Affiliation
1 Syamsul Bahri Bahar Universitas Muhammadiyah Buton

How to Cite

Use the following formats to cite this article in your research.

APA Style
Bahar, Syamsul Bahri (2020). EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT. International Journal of Advance Research and Innovative Ideas In Education, 6(4), 1712-1716.
MLA Style
Bahar, Syamsul Bahri. "EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT." International Journal of Advance Research and Innovative Ideas In Education, vol. 6, no. 4, 2020, pp. 1712-1716.
IEEE Style
Syamsul Bahri Bahar, "EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT," International Journal of Advance Research and Innovative Ideas In Education, vol. 6, no. 4, pp. 1712-1716, 2020.
Vancouver Style
Bahar Syamsul Bahri. EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT. International Journal of Advance Research and Innovative Ideas In Education. 2020;6(4):1712-1716.
Harvard Style
Bahar, Syamsul Bahri (2020) 'EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT', International Journal of Advance Research and Innovative Ideas In Education, 6(4), pp. 1712-1716.
Chicago Style
Bahar, Syamsul Bahri. "EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT." International Journal of Advance Research and Innovative Ideas In Education 6, no. 4 (2020): 1712-1716.
Turabian Style
Bahar, Syamsul Bahri. "EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT." International Journal of Advance Research and Innovative Ideas In Education 6, no. 4 (2020): 1712-1716.

Export Citation