Cost Comparative Study of PEB with Conventional Method for Industrial Building

January 2021
Vol-7, Issue-1
Paper ID: 13468
ISSN: 2395-4396
Downloads: 68
Download PDF

Abstract & Details

Research Area
Architectural & Construction Project Management
Keywords
PEB CSB
Abstract
In this, industrial shed has been designed (only primary framing members) using conventional steel bldg. concept and PEB concept and the comparison of design results of that structure had been carried out in details. The Present work involves the comparative revise of Pre-Engineering Buildings (PEB) and Conventional steel Building (CSB). Conventional Steel Building is old concept which takes lots of time, quality and typical erection factor to modify that issues Pre-Engineering concept is developed. It introduced to the Indian market in 1990’s.PEB Concept is totally versatile not only due to its quality, prefabrication, and light weight and economical construction. The study is achieved by time and cost performance in industrial construction for pre engineered building.

Author Information

# Name Institute / Affiliation
1 Shalaka Patil College of Architecture,Kolhapur

How to Cite

Use the following formats to cite this article in your research.

APA Style
Patil, Shalaka (2021). Cost Comparative Study of PEB with Conventional Method for Industrial Building. International Journal of Advance Research and Innovative Ideas In Education, 7(1), 207-218.
MLA Style
Patil, Shalaka. "Cost Comparative Study of PEB with Conventional Method for Industrial Building." International Journal of Advance Research and Innovative Ideas In Education, vol. 7, no. 1, 2021, pp. 207-218.
IEEE Style
Shalaka Patil, "Cost Comparative Study of PEB with Conventional Method for Industrial Building," International Journal of Advance Research and Innovative Ideas In Education, vol. 7, no. 1, pp. 207-218, 2021.
Vancouver Style
Patil Shalaka. Cost Comparative Study of PEB with Conventional Method for Industrial Building. International Journal of Advance Research and Innovative Ideas In Education. 2021;7(1):207-218.
Harvard Style
Patil, Shalaka (2021) 'Cost Comparative Study of PEB with Conventional Method for Industrial Building', International Journal of Advance Research and Innovative Ideas In Education, 7(1), pp. 207-218.
Chicago Style
Patil, Shalaka. "Cost Comparative Study of PEB with Conventional Method for Industrial Building." International Journal of Advance Research and Innovative Ideas In Education 7, no. 1 (2021): 207-218.
Turabian Style
Patil, Shalaka. "Cost Comparative Study of PEB with Conventional Method for Industrial Building." International Journal of Advance Research and Innovative Ideas In Education 7, no. 1 (2021): 207-218.

Export Citation