Root Causes & significant Cost of Rework due to owner & contractor related factors
Abstract & Details
Research Area
civil engineering
Keywords
Impact of rework
Direct &indirect costs
and Rework reducing strategies.
Abstract
Rework is a major provider to cost and schedule. In a large composite environment that involves numerous levels of trades, suppliers and installers, and where many activities take place simultaneously, the possibility for errors, omissions and poor administration practices often cause neglect to facilitate can lead to quality failures, which must then be reworked. Errors are defined as accidental deviation from correct and adequate practices and lead to project cost and schedule overruns, which are both unnecessary and avoidable.. In addition to activities and sources previously describe the analysis of sample experimental autonomous research data from a diversity of construction and engineering projects typically measures the cost of rework based on project type, project industry, project size and by procurement method. These data analysis are based on both direct and indirect costs that are attributable in the road and rail network and building industries. This paper evaluate the impact of rework on direct and indirect construction cost for project types, project industry, and project size and procurement methods in different categories. By recognize the impacts of rework and its sources, the construction industry can reduce amend and ultimately progress project plan and cost performance
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | maheshkumar ramesh shinde | TSSM’s Padmabhooshan Vasantdada Patil Institute of Technology, Bavdhan, Pune. |
How to Cite
Use the following formats to cite this article in your research.
APA Style
shinde, maheshkumar ramesh (2016). Root Causes & significant Cost of Rework due to owner & contractor related factors. International Journal of Advance Research and Innovative Ideas In Education, 2(6), 1479-1482.
MLA Style
shinde, maheshkumar ramesh. "Root Causes & significant Cost of Rework due to owner & contractor related factors." International Journal of Advance Research and Innovative Ideas In Education, vol. 2, no. 6, 2016, pp. 1479-1482.
IEEE Style
maheshkumar ramesh shinde, "Root Causes & significant Cost of Rework due to owner & contractor related factors," International Journal of Advance Research and Innovative Ideas In Education, vol. 2, no. 6, pp. 1479-1482, 2016.
Vancouver Style
shinde maheshkumar ramesh. Root Causes & significant Cost of Rework due to owner & contractor related factors. International Journal of Advance Research and Innovative Ideas In Education. 2016;2(6):1479-1482.
Harvard Style
shinde, maheshkumar ramesh (2016) 'Root Causes & significant Cost of Rework due to owner & contractor related factors', International Journal of Advance Research and Innovative Ideas In Education, 2(6), pp. 1479-1482.
Chicago Style
shinde, maheshkumar ramesh. "Root Causes & significant Cost of Rework due to owner & contractor related factors." International Journal of Advance Research and Innovative Ideas In Education 2, no. 6 (2016): 1479-1482.
Turabian Style
shinde, maheshkumar ramesh. "Root Causes & significant Cost of Rework due to owner & contractor related factors." International Journal of Advance Research and Innovative Ideas In Education 2, no. 6 (2016): 1479-1482.
Related Research
MECHANIZED CONSTRUCTION TO INCREASE PRODUCTIVITY AND REDUCE CONSTRUCTION COST AND DURATION
Download PDF
AI-BASED SMART PARKING SYSTEM: EMPTY PARKING SPACE COUNTING AND DISPLAY FOR PARKING GUIDANCE
Download PDF
INFLUENCE OF CRITICAL SUCCESS FACTORS ON EFFECTIVE DELAY MANAGEMENT IN CONSTRUCTION PROJECTS
Download PDF
USE OF GREEN ENERGY FOR GENERATING ELECTRICITY USING TRANSPARENT SOLAR PANELS IN BUILDING CONSTRUCTIONS
Download PDF
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
Download PDF
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
Download PDF