Cost optimization of Project by crashing project schedule using linear programming

July 2017
Vol-3, Issue-4
Paper ID: 6190
ISSN: 2395-4396
Downloads: 65
Download PDF

Abstract & Details

Research Area
Civil Engineering
Keywords
Linear Programming CPM network Project Scheduling
Abstract
Project scheduling is very essential part of the project planning phase. Cost optimization of project can be achieved by completing the project before the completion time of the project, which saves additional overhead cost of the construction project. To complete the project work before the scheduled time activity crashing is the best solution to that. Project having more activities can be difficult and so linear programming technique can be applied to the project crashing work and the optimum value to crash the project duration for the desired time can be calculated using LINDO (linear programming software). Three different options are selected having different construction materials for a defined size of floor work. Crashing of project is carried out for the one floor of the apartment of MIG housing scheme having 4192 sq ft super built up area.

Author Information

# Name Institute / Affiliation
1 Nilay P Golakia Dr. D. Y. Patil College of engineering, Akurdi - Pune
2 Proff. Smita Pataskar Dr. D. Y. Patil College of engineering, Akurdi - Pune
3 Proff. Sadhana Shalu Dr. D. Y. Patil College of engineering, Akurdi - Pune
4 Dr. M.S. Kaulgi Dr. D. Y. Patil College of engineering, Akurdi - Pune

How to Cite

Use the following formats to cite this article in your research.

APA Style
Golakia, Nilay P, Pataskar, Proff. Smita, Shalu, Proff. Sadhana, & Kaulgi, Dr. M.S. (2017). Cost optimization of Project by crashing project schedule using linear programming. International Journal of Advance Research and Innovative Ideas In Education, 3(4), 1524-1532.
MLA Style
Golakia, Nilay P, et al. "Cost optimization of Project by crashing project schedule using linear programming." International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 4, 2017, pp. 1524-1532.
IEEE Style
Nilay P Golakia, Proff. Smita Pataskar, Proff. Sadhana Shalu, and Dr. M.S. Kaulgi, "Cost optimization of Project by crashing project schedule using linear programming," International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 4, pp. 1524-1532, 2017.
Vancouver Style
Golakia Nilay P, Pataskar Proff. Smita, Shalu Proff. Sadhana, Kaulgi Dr. M.S.. Cost optimization of Project by crashing project schedule using linear programming. International Journal of Advance Research and Innovative Ideas In Education. 2017;3(4):1524-1532.
Harvard Style
Golakia, Nilay P, Pataskar, Proff. Smita, Shalu, Proff. Sadhana, & Kaulgi, Dr. M.S. (2017) 'Cost optimization of Project by crashing project schedule using linear programming', International Journal of Advance Research and Innovative Ideas In Education, 3(4), pp. 1524-1532.
Chicago Style
Golakia, Nilay P, et al. "Cost optimization of Project by crashing project schedule using linear programming." International Journal of Advance Research and Innovative Ideas In Education 3, no. 4 (2017): 1524-1532.
Turabian Style
Golakia, Nilay P, et al. "Cost optimization of Project by crashing project schedule using linear programming." International Journal of Advance Research and Innovative Ideas In Education 3, no. 4 (2017): 1524-1532.

Export Citation

Related Research