Time and Cost Optimization in project excution
Abstract & Details
Research Area
Civil Engineering
Keywords
critical path method
crashing
cost optimization
cost.
Abstract
The main objective in the field of construction is to complete every project on time, within budget and quality full. The requirements of construction management are the useful utility, structural firmness, economy, speed, and quality of construction. In the every construction project time and cost trade-off are two important factors. It is crucial in achieving the project objectives. Dealing with different conflicting facets of the project is one of the challenging problems which often Construction Company has to face. Time loss is always costly and time-saving can provide profit to all the parties in the project. There is always a mutual affinity between time and cost. Time cost optimization is necessary and very important for a construction project. The objective of time cost optimization is to determine optimum project duration corresponding to the minimum total cost and this can be achieved with help of reducing the duration of critical activities in the network in order by breaking the activities of critical activities to minimize the overall project duration. In this study, critical path method (CPM) with an investigative method is used to find out the crash duration and crash cost and. An analysis is performed to identify the relationship between the time and cost in order to formalize an optimization problem model. In the analysis part, for this problem solving will be performed by manual methods. Then the reasons are introduced to increase the duration of project, then through project crashing technique optimisation of time and cost will be easy early completion of project applying this approach the obtained result is satisfactory, that is an indication of usefulness of this approach in construction project management problems, a numerical example in the paper shows the advantage of the proposed approach.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | Shamsul Haque Hamidullah | Al-FALAH UNIVERSITY |
How to Cite
Use the following formats to cite this article in your research.
APA Style
Hamidullah, Shamsul Haque (2017). Time and Cost Optimization in project excution. International Journal of Advance Research and Innovative Ideas In Education, 3(4), 2491-2497.
MLA Style
Hamidullah, Shamsul Haque. "Time and Cost Optimization in project excution." International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 4, 2017, pp. 2491-2497.
IEEE Style
Shamsul Haque Hamidullah, "Time and Cost Optimization in project excution," International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 4, pp. 2491-2497, 2017.
Vancouver Style
Hamidullah Shamsul Haque. Time and Cost Optimization in project excution. International Journal of Advance Research and Innovative Ideas In Education. 2017;3(4):2491-2497.
Harvard Style
Hamidullah, Shamsul Haque (2017) 'Time and Cost Optimization in project excution', International Journal of Advance Research and Innovative Ideas In Education, 3(4), pp. 2491-2497.
Chicago Style
Hamidullah, Shamsul Haque. "Time and Cost Optimization in project excution." International Journal of Advance Research and Innovative Ideas In Education 3, no. 4 (2017): 2491-2497.
Turabian Style
Hamidullah, Shamsul Haque. "Time and Cost Optimization in project excution." International Journal of Advance Research and Innovative Ideas In Education 3, no. 4 (2017): 2491-2497.
Related Research
MECHANIZED CONSTRUCTION TO INCREASE PRODUCTIVITY AND REDUCE CONSTRUCTION COST AND DURATION
Download PDF
AI-BASED SMART PARKING SYSTEM: EMPTY PARKING SPACE COUNTING AND DISPLAY FOR PARKING GUIDANCE
Download PDF
INFLUENCE OF CRITICAL SUCCESS FACTORS ON EFFECTIVE DELAY MANAGEMENT IN CONSTRUCTION PROJECTS
Download PDF
USE OF GREEN ENERGY FOR GENERATING ELECTRICITY USING TRANSPARENT SOLAR PANELS IN BUILDING CONSTRUCTIONS
Download PDF
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
Download PDF
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
Download PDF