Study on Project Schedule and Cost Overruns
Abstract & Details
Research Area
Civil Engineering
Keywords
Risk Factors
overrun
Delay
Cost overrun
Construction projects
Time overrun.
Abstract
Risk plays an important role in the success of construction project. In managing risk, identification of risk factors is very critical. Hence, this study focused on the investigation of risk factors from contractors’ perspective as the contractors are key players in the success of a project. Investigations on the risk factor involved 35 common risk factors classified in five categories and ranking them with the help of questionnaire survey. The data has been Theoretical analysed by following techniques:- Frequency Index, Severity Index, Importance Index and Relative Importance Index. Results found that the five most important risk factors in construction project are escalation in price of material, changes in government regulations and laws, shortages of materials and equipment’s, cash flow and financial difficulties. Method developed in this study can help agencies and hence estimation of expected overruns of final cost and delay in completion time for their planned project. The findings of this study would assist in dealing with risks encountered in construction projects.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | Saurabh Patel | MIT COLLEGE OF MANAGAMENT, Pune |
| 2 | Harjinder Patel | MIT COLLEGE OF MANAGAMENT, Pune |
How to Cite
Use the following formats to cite this article in your research.
APA Style
Patel, Saurabh & Patel, Harjinder (2018). Study on Project Schedule and Cost Overruns. International Journal of Advance Research and Innovative Ideas In Education, 4(2), 3440-3453.
MLA Style
Patel, Saurabh, and Harjinder Patel. "Study on Project Schedule and Cost Overruns." International Journal of Advance Research and Innovative Ideas In Education, vol. 4, no. 2, 2018, pp. 3440-3453.
IEEE Style
Saurabh Patel and Harjinder Patel, "Study on Project Schedule and Cost Overruns," International Journal of Advance Research and Innovative Ideas In Education, vol. 4, no. 2, pp. 3440-3453, 2018.
Vancouver Style
Patel Saurabh, Patel Harjinder. Study on Project Schedule and Cost Overruns. International Journal of Advance Research and Innovative Ideas In Education. 2018;4(2):3440-3453.
Harvard Style
Patel, Saurabh & Patel, Harjinder (2018) 'Study on Project Schedule and Cost Overruns', International Journal of Advance Research and Innovative Ideas In Education, 4(2), pp. 3440-3453.
Chicago Style
Patel, Saurabh and Harjinder Patel. "Study on Project Schedule and Cost Overruns." International Journal of Advance Research and Innovative Ideas In Education 4, no. 2 (2018): 3440-3453.
Turabian Style
Patel, Saurabh and Harjinder Patel. "Study on Project Schedule and Cost Overruns." International Journal of Advance Research and Innovative Ideas In Education 4, no. 2 (2018): 3440-3453.
Related Research
MECHANIZED CONSTRUCTION TO INCREASE PRODUCTIVITY AND REDUCE CONSTRUCTION COST AND DURATION
Download PDF
AI-BASED SMART PARKING SYSTEM: EMPTY PARKING SPACE COUNTING AND DISPLAY FOR PARKING GUIDANCE
Download PDF
INFLUENCE OF CRITICAL SUCCESS FACTORS ON EFFECTIVE DELAY MANAGEMENT IN CONSTRUCTION PROJECTS
Download PDF
USE OF GREEN ENERGY FOR GENERATING ELECTRICITY USING TRANSPARENT SOLAR PANELS IN BUILDING CONSTRUCTIONS
Download PDF
Evaluation of Pavement Distress and Maintenance Strategies for National Highway NH-448 (Ajmer to Beawar Section), Rajasthan
Download PDF
Wind-Induced Productivity Loss in Pre-Engineered Building Erection: A Regression-Based Analysis from a High-Wind Zone Ajmer, (India)
Download PDF