Logo
  • Home
  • About Us
    • Aim and Scope
    • Research Area
    • Impact Factor
    • Indexing
  • For Authors
    • Authors Guidelines
    • How to publish paper?
    • Download Paper format
    • Submit Manuscript
    • Processing Charges
    • Download Copyrights Form
    • Submit Payment-Copyrights
  • Archives
    • Current Issues
    • Past Issues
    • Conference Issues
    • Special Issues
    • Advance Search
  • IJARIIE Board
    • Join as IJARIIE Board
    • Advisory Board
    • Editorial Board
    • Sr. Reviewer Board
    • Jr. Reviewer Board
  • Proposal
    • Conferece Proposal
    • Special Proposal
    • Faqs
  • Contact Us
  • Payment Detail

Call for Papers:Vol.11 Issue.3

Submission
Last date
28-Jun-2025
Acceptance Status In One Day
Paper Publish In Two Days
Submit ManuScript

News & Updates

Submit Article

Dear Authors, Article publish in our journal for Volume-11,Issue-3. For article submission on below link: Submit Manuscript


Join As Board

Dear Reviewer, You can join our Reviewer team without given any charges in our journal. Submit Details on below link: Join As Board


Paper Publication Charges

IJARIIE APP
Download Android App

For Authors

  • How to Publish Paper
  • Submit Manuscript
  • Processing Charges
  • Submit Payment

Archives

  • Current Issue
  • Past Issue

IJARIIE Board

  • Member Of Board
  • Join As Board

Downloads

  • Authors Guidelines
  • Manuscript Template
  • Copyrights Form

Android App

Download IJARIIE APP
  • Authors
  • Abstract
  • Citations
  • Downloads
  • Similar-Paper

Authors

Title: :  EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT
PaperId: :  12533
Published in:   International Journal Of Advance Research And Innovative Ideas In Education
Publisher:   IJARIIE
e-ISSN:   2395-4396
Volume/Issue:    Volume 6 Issue 4 2020
DUI:    16.0415/IJARIIE-12533
Licence: :   IJARIIE is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Author NameAuthor Institute
Syamsul Bahri Bahar Universitas Muhammadiyah Buton

Abstract

Engineering
Net Present Value (NPV), Break event point (BEP)
The government's program by increasing the capacity of the Baubau dock / port is in order to accelerate economic development and overcome the number of ships that are no longer able to accommodate loading and unloading of goods and passengers. Heavy equipment investment in port / dock development work certainly requires a large enough initial capital and a long time to return investment capital, so the research objective of this is to assess the feasibility of investment and the payback period. The decision to invest in heavy equipment in local government projects, in particular the work of constructing a new pier and upgrading the existing pier structure, requires in-depth analysis and studies using the Net Present Value (NPV) method and the Internal Rate of Return (IRR) and the Break Event Point (BEP) as a reference to determine whether a project is feasible or not and the payback period for investment. The conclusion from the results of this study is the excavator investment value of IDR. 1,450,000,000, - with a Net Present Value (NPV) of IDR. 4,282,331.62 is greater than zero (investment worthy) and the value of the Internal Rate of Return (IRR) is 7.07% greater than 7% (feasible for investment). Break event point (BEP) or the excavator investment payback period of 2,816 hours. The conclusion from the results of this study is the excavator investment value of IDR. 1,450,000,000, - with a Net Present Value (NPV) of IDR. 4,282,331.62 is greater than zero (investment worthy) and the value of the Internal Rate of Return (IRR) is 7.07% greater than 7% (feasible for investment). Break event point (BEP) or the excavator investment payback period of 2,816 hours. The conclusion from the results of this study is the excavator investment value of IDR. 1,450,000,000, - with a Net Present Value (NPV) of IDR. 4,282,331.62 is greater than zero (investment worthy) and the value of the Internal Rate of Return (IRR) is 7.07% greater than 7% (feasible for investment). Break event point (BEP) or the excavator investment payback period of 2,816 hours.

Citations

Copy and paste a formatted citation or use one of the links to import into a bibliography manager and reference.

IJARIIE Syamsul Bahri Bahar . "EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT" International Journal Of Advance Research And Innovative Ideas In Education Volume 6 Issue 4 2020 Page 1712-1716
MLA Syamsul Bahri Bahar . "EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT." International Journal Of Advance Research And Innovative Ideas In Education 6.4(2020) : 1712-1716.
APA Syamsul Bahri Bahar . (2020). EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT. International Journal Of Advance Research And Innovative Ideas In Education, 6(4), 1712-1716.
Chicago Syamsul Bahri Bahar . "EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT." International Journal Of Advance Research And Innovative Ideas In Education 6, no. 4 (2020) : 1712-1716.
Oxford Syamsul Bahri Bahar . 'EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT', International Journal Of Advance Research And Innovative Ideas In Education, vol. 6, no. 4, 2020, p. 1712-1716. Available from IJARIIE, http://ijariie.com/AdminUploadPdf/EVALUATION_OF_EXCAVATOR_INVESTMENT_COSTS_IN_BAUBAU_PORT_DEVELOPMENT_PROJECT_ijariie12533.pdf (Accessed : 05 January 2021).
Harvard Syamsul Bahri Bahar . (2020) 'EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT', International Journal Of Advance Research And Innovative Ideas In Education, 6(4), pp. 1712-1716IJARIIE [Online]. Available at: http://ijariie.com/AdminUploadPdf/EVALUATION_OF_EXCAVATOR_INVESTMENT_COSTS_IN_BAUBAU_PORT_DEVELOPMENT_PROJECT_ijariie12533.pdf (Accessed : 05 January 2021)
IEEE Syamsul Bahri Bahar , "EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT," International Journal Of Advance Research And Innovative Ideas In Education, vol. 6, no. 4, pp. 1712-1716, Jul-Aug 2020. [Online]. Available: http://ijariie.com/AdminUploadPdf/EVALUATION_OF_EXCAVATOR_INVESTMENT_COSTS_IN_BAUBAU_PORT_DEVELOPMENT_PROJECT_ijariie12533.pdf [Accessed : 05 January 2021].
Turabian Syamsul Bahri Bahar . "EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT." International Journal Of Advance Research And Innovative Ideas In Education [Online]. volume 6 number 4 (05 January 2021).
Vancouver Syamsul Bahri Bahar . EVALUATION OF EXCAVATOR INVESTMENT COSTS IN BAUBAU PORT DEVELOPMENT PROJECT. International Journal Of Advance Research And Innovative Ideas In Education [Internet]. 2020 [Cited : 05 January 2021]; 6(4) : 1712-1716. Available from: http://ijariie.com/AdminUploadPdf/EVALUATION_OF_EXCAVATOR_INVESTMENT_COSTS_IN_BAUBAU_PORT_DEVELOPMENT_PROJECT_ijariie12533.pdf
BibTex EndNote RefMan RefWorks

Number Of Downloads


Last download on 1/5/2021 9:57:28 PM

Save in Google Drive

Similar-Paper

TitleArea of ResearchAuther NameAction
Prediction of safety in Autonomous Vehicles using Modified Deep CNN-BiLSTM with attention mechanismElectronics and automobile engineeringSophiya Bartalwar Download
Artificial Intelligence Transformation in Automobile IndustryComputer Engineering Harsh Khatri Download
A Review of Deep Learning Techniques in Traffic Rule Detection System Using ADASDeep Learning, Advanced Driver Assistance SystemsTanishq Soni Download
Design and Analysis of Battery Bracket for Electric VehicleMechanical Engineering Nawale saurabh Download
PARKING MANAGEMENT SYSTEM: OPTIMIZING URBAN SPACES WITH SMART SOLUTIONS FOR EFFECTIVE UTILIZATION OF UNUSED PARKING SPACESCOMPUTER ENGINEERING AND AUTOMOBILE ENGINEERINGSARAVANAN E Download
PEDESTRAIN SAFETY DEVICE IN TRAFFIC SIGNAL.AUTOMOBILE ENGINEERINGSURIYA KUMAR G Download
PLANT SAFETY INSPECTION STUDIES IN AUTOMOBILE INDUSTRIESIndustrial Safety EngineeringJaya Prakash T Download
Design and implementation of CVVT & CVVL technology in a V8 engineAutomobile EngineeringAmmar Kazi Download
A review on Continuously Variable transmissions (CVT)Mechanical EngineeringAkshay Ganpat Tajane Download
TPM IMPLEMENTATION IN AUTOMOBILE INDUSTRIESAUTOMOBILE MOBILE Rakesh Kumar Yadav Download
UNDER SEAT SUSPENSION SYSTEMMechanical EngineeringAshutosh Khuntia Download
Tire Modelling and Validation of Tire Diameter and WidthMechanical EngineeringAlok Patnaik Download
Vector Control On Electric Traction System Of A Vehicle: A SurveyAutomotive EngineeringPrakhar Vishwakarma Download
"Improvement in Performance and Reduction in Emission of Single Cylinder 4- Stroke SI Engine with Implementation of Swirl Adapter in Intake Manifold"Automobile EngineeringAbhishek D. Jaiswal Download
Advancement in parallel hybrid system for converting the existing conventional bike in to hybrid electric bikeAutomobile engineeringSandeep G Imale Download
12
For Authors
  • Submit Paper
  • Processing Charges
  • Submit Payment
Archive
  • Current Issue
  • Past Issue
IJARIIE Board
  • Member Of Board
  • Join As Board
Privacy and Policy
Follow us

Contact Info
  • +91-8401209201 (India)
  • +86-15636082010 (China)
  • ijariiejournal@gmail.com
  • M-20/234 Ami Appt,
    Nr.Naranpura Tele-Exch,
    Naranpura,
    Ahemdabad-380063
    Gujarat,India.
Copyright © 2025. IJARIIE. All Rights Reserved.