Energy Analysis of 12.5 MW Co-generation plant at Porbandar

May 2016
Vol-2, Issue-3
Paper ID: 2167
ISSN: 2395-4396
Downloads: 67
Download PDF

Abstract & Details

Research Area
Mechanical Engineering
Keywords
Energy Boiler Efficiency Extraction back- Pressure Turbine
Abstract
The point of this project is to utilize the energy analysis in view of the first law of thermodynamics to recognize the areas and magnitudes of losses with a specific end goal to boost the execution of a12.5 MW plant at Nirma organization ltd., Porbandar, to assess the general plant, heater, and turbine and subsystem inefficiencies. Energy flows in a boiler have been appeared in this paper. The heater proficiency is figured utilizing backhanded strategy in the wake of evaluating the different warmth misfortunes in the boilers. From results the general heat losses of the plant by processing the individual proficiency of the boiler (78.85%), steam turbine (35.75%), and generator (95%). The general proficiency of the plant seems, by all accounts, to be 25.78 %

Author Information

# Name Institute / Affiliation
1 Milan Pankhaniya Atmiya Institute Of Technology & Science, Rajkot
2 Akash Shukla Atmiya Institute Of Technology & Science, Rajkot
3 Ashutosh Joshi Atmiya Institute Of Technology & Science, Rajkot
4 Hardik Paneliya Atmiya Institute Of Technology & Science, Rajkot

How to Cite

Use the following formats to cite this article in your research.

APA Style
Pankhaniya, Milan, Shukla, Akash, Joshi, Ashutosh, & Paneliya, Hardik (2016). Energy Analysis of 12.5 MW Co-generation plant at Porbandar. International Journal of Advance Research and Innovative Ideas In Education, 2(3), 589-594.
MLA Style
Pankhaniya, Milan, et al. "Energy Analysis of 12.5 MW Co-generation plant at Porbandar." International Journal of Advance Research and Innovative Ideas In Education, vol. 2, no. 3, 2016, pp. 589-594.
IEEE Style
Milan Pankhaniya, Akash Shukla, Ashutosh Joshi, and Hardik Paneliya, "Energy Analysis of 12.5 MW Co-generation plant at Porbandar," International Journal of Advance Research and Innovative Ideas In Education, vol. 2, no. 3, pp. 589-594, 2016.
Vancouver Style
Pankhaniya Milan, Shukla Akash, Joshi Ashutosh, Paneliya Hardik. Energy Analysis of 12.5 MW Co-generation plant at Porbandar. International Journal of Advance Research and Innovative Ideas In Education. 2016;2(3):589-594.
Harvard Style
Pankhaniya, Milan, Shukla, Akash, Joshi, Ashutosh, & Paneliya, Hardik (2016) 'Energy Analysis of 12.5 MW Co-generation plant at Porbandar', International Journal of Advance Research and Innovative Ideas In Education, 2(3), pp. 589-594.
Chicago Style
Pankhaniya, Milan, et al. "Energy Analysis of 12.5 MW Co-generation plant at Porbandar." International Journal of Advance Research and Innovative Ideas In Education 2, no. 3 (2016): 589-594.
Turabian Style
Pankhaniya, Milan, et al. "Energy Analysis of 12.5 MW Co-generation plant at Porbandar." International Journal of Advance Research and Innovative Ideas In Education 2, no. 3 (2016): 589-594.

Export Citation

Related Research

COMPARATIVE EVALUATION OF SOLAR COLLECTORS FOR AQUA-AMMONIA ABSORPTION SYSTEMS
DIVYESHKUMAR T PATEL et al. 2026 SOLAR ENERGY,SOLAR REFRIGERATION,SOLAR COLLECTORS
Download PDF