Development of Assembly Fixture for Reduction of Set up Time

March 2017
Vol-3, Issue-2
Paper ID: 4259
ISSN: 2395-4396
Downloads: 61
Download PDF

Abstract & Details

Research Area
Mechanical
Keywords
Fixture Cost Reduction Assembly Fixture
Abstract
A fixture is a work-holding or support device used in the manufacturing industry. Fixtures are used to securely locate and support the work, ensuring that all parts produced using the fixture will maintain conformity and interchange ability. Using a fixture improves the economy of production by allowing smooth operation and quick transition from part to part, reducing the requirement for skilled labour by simplifying how work pieces are mounted, and increasing conformity across a production run. Fixtures must always be designed with economics in mind; the purpose of these devices is to reduce costs, and so they must be designed in such a way that the cost reduction outweighs the cost of implementing the fixture. It is usually better, from an economic standpoint, for a fixture to result in a small cost reduction for a process in constant use, than for a large cost reduction for a process used only occasionally. This assembly fixture helps to reduce the assembly time with reduction of the worker fatigue.

Author Information

# Name Institute / Affiliation
1 More Sagar R MET's BKC IOT-P
2 Desai Abhishek D MET's BKC IOT-P
3 Yeola Aniket P MET's BKC IOT-P
4 Gawali Pranit P MET's BKC IOT-P
5 Kothawade Vaibhav E MET's BKC IOT-P
6 Vadnere Amol P MET's BKC IOT-P

How to Cite

Use the following formats to cite this article in your research.

APA Style
R, More Sagar, D, Desai Abhishek, P, Yeola Aniket, P, Gawali Pranit, E, Kothawade Vaibhav, & P, Vadnere Amol (2017). Development of Assembly Fixture for Reduction of Set up Time. International Journal of Advance Research and Innovative Ideas In Education, 3(2), 1423-1427.
MLA Style
R, More Sagar, et al. "Development of Assembly Fixture for Reduction of Set up Time." International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 2, 2017, pp. 1423-1427.
IEEE Style
More Sagar R, Desai Abhishek D, Yeola Aniket P, Gawali Pranit P, Kothawade Vaibhav E, and Vadnere Amol P, "Development of Assembly Fixture for Reduction of Set up Time," International Journal of Advance Research and Innovative Ideas In Education, vol. 3, no. 2, pp. 1423-1427, 2017.
Vancouver Style
R More Sagar, D Desai Abhishek, P Yeola Aniket, P Gawali Pranit, E Kothawade Vaibhav, P Vadnere Amol. Development of Assembly Fixture for Reduction of Set up Time. International Journal of Advance Research and Innovative Ideas In Education. 2017;3(2):1423-1427.
Harvard Style
R, More Sagar, D, Desai Abhishek, P, Yeola Aniket, P, Gawali Pranit, E, Kothawade Vaibhav, & P, Vadnere Amol (2017) 'Development of Assembly Fixture for Reduction of Set up Time', International Journal of Advance Research and Innovative Ideas In Education, 3(2), pp. 1423-1427.
Chicago Style
R, More Sagar, et al. "Development of Assembly Fixture for Reduction of Set up Time." International Journal of Advance Research and Innovative Ideas In Education 3, no. 2 (2017): 1423-1427.
Turabian Style
R, More Sagar, et al. "Development of Assembly Fixture for Reduction of Set up Time." International Journal of Advance Research and Innovative Ideas In Education 3, no. 2 (2017): 1423-1427.

Export Citation

Related Research

COMPARATIVE EVALUATION OF SOLAR COLLECTORS FOR AQUA-AMMONIA ABSORPTION SYSTEMS
DIVYESHKUMAR T PATEL et al. 2026 SOLAR ENERGY,SOLAR REFRIGERATION,SOLAR COLLECTORS
Download PDF