EFFECTIVE PRODUTION AND IMPROVING SAFETY MEASURES OF PREFORMING MACHINE

April 2018
Vol-4, Issue-2
Paper ID: 8181
ISSN: 2395-4396
Downloads: 57
Download PDF

Abstract & Details

Research Area
Mechanical Engineering
Keywords
lean manufacturing labour fatigue reduce time consumption safety increased production.
Abstract
Our paper aims upon improvisation of performance, time consumption, safety measures and to reduce labour fatique of performing machine used in brake linings. On weighing and operating the preforming machine the labour undergoes certain labour troubles and exercises abnormal stresses. Also the preforming machine consumes more time and is seriously injurious to labour. In order to avoid these labour problems and to use time wisely, we reduce unnecessary waiting time of labour and to increase safety of the labour thereby getting a huge increase in the production. We have compiled these improvements into poke yokes system for effective production.

Author Information

# Name Institute / Affiliation
1 M.BHAVANI New Prince Shri Bhavani College of Engineering and Technology, Chennai, Tamilnadu, India.
2 K.GURU GANESH New Prince Shri Bhavani College of Engineering and Technology, Chennai, Tamilnadu, India.
3 K.PAUL BRAINERD New Prince Shri Bhavani College of Engineering and Technology, Chennai, Tamilnadu, India.
4 M.VEERAMURASU New Prince Shri Bhavani College of Engineering and Technology, Chennai, Tamilnadu, India.
5 M.VINOTH KUMAR New Prince Shri Bhavani College of Engineering and Technology, Chennai, Tamilnadu, India.

How to Cite

Use the following formats to cite this article in your research.

APA Style
M.BHAVANI, GANESH, K.GURU, BRAINERD, K.PAUL, M.VEERAMURASU, & KUMAR, M.VINOTH (2018). EFFECTIVE PRODUTION AND IMPROVING SAFETY MEASURES OF PREFORMING MACHINE. International Journal of Advance Research and Innovative Ideas In Education, 4(2), 3627-3632.
MLA Style
M.BHAVANI, et al. "EFFECTIVE PRODUTION AND IMPROVING SAFETY MEASURES OF PREFORMING MACHINE." International Journal of Advance Research and Innovative Ideas In Education, vol. 4, no. 2, 2018, pp. 3627-3632.
IEEE Style
M.BHAVANI, K.GURU GANESH, K.PAUL BRAINERD, M.VEERAMURASU, and M.VINOTH KUMAR, "EFFECTIVE PRODUTION AND IMPROVING SAFETY MEASURES OF PREFORMING MACHINE," International Journal of Advance Research and Innovative Ideas In Education, vol. 4, no. 2, pp. 3627-3632, 2018.
Vancouver Style
M.BHAVANI, GANESH K.GURU, BRAINERD K.PAUL, M.VEERAMURASU, KUMAR M.VINOTH. EFFECTIVE PRODUTION AND IMPROVING SAFETY MEASURES OF PREFORMING MACHINE. International Journal of Advance Research and Innovative Ideas In Education. 2018;4(2):3627-3632.
Harvard Style
M.BHAVANI, GANESH, K.GURU, BRAINERD, K.PAUL, M.VEERAMURASU, & KUMAR, M.VINOTH (2018) 'EFFECTIVE PRODUTION AND IMPROVING SAFETY MEASURES OF PREFORMING MACHINE', International Journal of Advance Research and Innovative Ideas In Education, 4(2), pp. 3627-3632.
Chicago Style
M.BHAVANI, et al. "EFFECTIVE PRODUTION AND IMPROVING SAFETY MEASURES OF PREFORMING MACHINE." International Journal of Advance Research and Innovative Ideas In Education 4, no. 2 (2018): 3627-3632.
Turabian Style
M.BHAVANI, et al. "EFFECTIVE PRODUTION AND IMPROVING SAFETY MEASURES OF PREFORMING MACHINE." International Journal of Advance Research and Innovative Ideas In Education 4, no. 2 (2018): 3627-3632.

Export Citation

Related Research

COMPARATIVE EVALUATION OF SOLAR COLLECTORS FOR AQUA-AMMONIA ABSORPTION SYSTEMS
DIVYESHKUMAR T PATEL et al. 2026 SOLAR ENERGY,SOLAR REFRIGERATION,SOLAR COLLECTORS
Download PDF