A Review : feasibility and Implementation of VSM and 5’S lean tools in S.S. pipe manufacturing industries.
Abstract & Details
Research Area
Mechanical Engineering
Keywords
5’s
VSM
Takt time
Up time
Cycle time.
Abstract
The purpose of this study is to discuss the lean implementation process and its quantified benefits with the help
of value stream mapping (VSM) and 5’S lean tools.
Both current and future state map’s of the organization’s shop floor are discussed using VSM techniques in order
to highlight improvement areas and to bridge the gap between the existing state and the proposed state of shop
floor of the selected industries.
License
This work is licensed under a Creative
Commons
Attribution-ShareAlike 4.0 International License.
Author Information
| # | Name | Institute / Affiliation |
|---|---|---|
| 1 | Geeta M. Amin | TITS Modasa |
| 2 | Dr.M .B Diwan | TITS Modasa |
How to Cite
Use the following formats to cite this article in your research.
APA Style
Amin, Geeta M. & Diwan, Dr.M .B (2019). A Review : feasibility and Implementation of VSM and 5’S lean tools in S.S. pipe manufacturing industries.. International Journal of Advance Research and Innovative Ideas In Education, 5(2), 37-41.
MLA Style
Amin, Geeta M., and Dr.M .B Diwan. "A Review : feasibility and Implementation of VSM and 5’S lean tools in S.S. pipe manufacturing industries.." International Journal of Advance Research and Innovative Ideas In Education, vol. 5, no. 2, 2019, pp. 37-41.
IEEE Style
Geeta M. Amin and Dr.M .B Diwan, "A Review : feasibility and Implementation of VSM and 5’S lean tools in S.S. pipe manufacturing industries.," International Journal of Advance Research and Innovative Ideas In Education, vol. 5, no. 2, pp. 37-41, 2019.
Vancouver Style
Amin Geeta M., Diwan Dr.M .B. A Review : feasibility and Implementation of VSM and 5’S lean tools in S.S. pipe manufacturing industries.. International Journal of Advance Research and Innovative Ideas In Education. 2019;5(2):37-41.
Harvard Style
Amin, Geeta M. & Diwan, Dr.M .B (2019) 'A Review : feasibility and Implementation of VSM and 5’S lean tools in S.S. pipe manufacturing industries.', International Journal of Advance Research and Innovative Ideas In Education, 5(2), pp. 37-41.
Chicago Style
Amin, Geeta M. and Dr.M .B Diwan. "A Review : feasibility and Implementation of VSM and 5’S lean tools in S.S. pipe manufacturing industries.." International Journal of Advance Research and Innovative Ideas In Education 5, no. 2 (2019): 37-41.
Turabian Style
Amin, Geeta M. and Dr.M .B Diwan. "A Review : feasibility and Implementation of VSM and 5’S lean tools in S.S. pipe manufacturing industries.." International Journal of Advance Research and Innovative Ideas In Education 5, no. 2 (2019): 37-41.
Related Research
CONCEPTUALIZATION DEVELOPMENT OF A SMART STAIR-CLIMBING TROLLEY FOR MULTI-STOREY BUILDINGS USING DC POWER SYSTEM
Download PDF
EXPERIMENTAL ANALYSIS OF MECHANICAL AND METALLURGICAL CHARACTERISTICS OF ACTIVATED FLUX ASSISTED TIG WELDED MILD STEEL AND STAINLESS-STEEL JOINTS
Download PDF
Experimental And Numerical Investigation On Improving Cooling Performance Of Heat Sink.
Download PDF