Logo
  • Home
  • About Us
    • Aim and Scope
    • Research Area
    • Impact Factor
    • Indexing
  • For Authors
    • Authors Guidelines
    • How to publish paper?
    • Download Paper format
    • Submit Manuscript
    • Processing Charges
    • Download Copyrights Form
    • Submit Payment-Copyrights
  • Archives
    • Current Issues
    • Past Issues
    • Conference Issues
    • Special Issues
    • Advance Search
  • IJARIIE Board
    • Join as IJARIIE Board
    • Advisory Board
    • Editorial Board
    • Sr. Reviewer Board
    • Jr. Reviewer Board
  • Proposal
    • Conferece Proposal
    • Special Proposal
    • Faqs
  • Contact Us
  • Payment Detail

Call for Papers:Vol.11 Issue.3

Submission
Last date
28-Jun-2025
Acceptance Status In One Day
Paper Publish In Two Days
Submit ManuScript

News & Updates

Submit Article

Dear Authors, Article publish in our journal for Volume-11,Issue-3. For article submission on below link: Submit Manuscript


Join As Board

Dear Reviewer, You can join our Reviewer team without given any charges in our journal. Submit Details on below link: Join As Board


Paper Publication Charges

IJARIIE APP
Download Android App

For Authors

  • How to Publish Paper
  • Submit Manuscript
  • Processing Charges
  • Submit Payment

Archives

  • Current Issue
  • Past Issue

IJARIIE Board

  • Member Of Board
  • Join As Board

Downloads

  • Authors Guidelines
  • Manuscript Template
  • Copyrights Form

Android App

Download IJARIIE APP
  • Authors
  • Abstract
  • Citations
  • Downloads
  • Similar-Paper

Authors

Title: :  Manpower Optimization using Time Study Analysis
PaperId: :  18916
Published in:   International Journal Of Advance Research And Innovative Ideas In Education
Publisher:   IJARIIE
e-ISSN:   2395-4396
Volume/Issue:    Volume 8 Issue 6 2022
DUI:    16.0415/IJARIIE-18916
Licence: :   IJARIIE is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Author NameAuthor Institute
Shubhranshu MishraVeer Surendra Sai University of Technology, Odisha, India
Subham SahooVeer Surendra Sai University of Technology, Odisha, India
Alok PatnaikVeer Surendra Sai University of Technology, Odisha, India

Abstract

Industrial Engineering
Time Study, Kaizens, Quality Assurance, Idle time, Assembly Line, Manpower Requirement
Time studies seek to determine how much time it takes a qualified worker to complete an individual task at a predefined performance level. A time study, when done correctly, can help managers and business owners see how efficiently and effectively work is done on a production floor. The goal of a time study is to determine the average time it takes a worker with reasonable skill and ability to complete a specific task, estimate labor costs, and instill time management in employees. This paper discusses a method for analyzing idle time in various jobs by implementing kaizens on the shop floor and incorporating parameters such as working hours per shift and inspection lists to calculate the efficiency of people working in various departments in the industry.

Citations

Copy and paste a formatted citation or use one of the links to import into a bibliography manager and reference.

IJARIIE Shubhranshu Mishra, Subham Sahoo, and Alok Patnaik. "Manpower Optimization using Time Study Analysis" International Journal Of Advance Research And Innovative Ideas In Education Volume 8 Issue 6 2022 Page 2026-2035
MLA Shubhranshu Mishra, Subham Sahoo, and Alok Patnaik. "Manpower Optimization using Time Study Analysis." International Journal Of Advance Research And Innovative Ideas In Education 8.6(2022) : 2026-2035.
APA Shubhranshu Mishra, Subham Sahoo, & Alok Patnaik. (2022). Manpower Optimization using Time Study Analysis. International Journal Of Advance Research And Innovative Ideas In Education, 8(6), 2026-2035.
Chicago Shubhranshu Mishra, Subham Sahoo, and Alok Patnaik. "Manpower Optimization using Time Study Analysis." International Journal Of Advance Research And Innovative Ideas In Education 8, no. 6 (2022) : 2026-2035.
Oxford Shubhranshu Mishra, Subham Sahoo, and Alok Patnaik. 'Manpower Optimization using Time Study Analysis', International Journal Of Advance Research And Innovative Ideas In Education, vol. 8, no. 6, 2022, p. 2026-2035. Available from IJARIIE, https://ijariie.com/AdminUploadPdf/Manpower_Optimization_using_Time_Study_Analysis_ijariie18916.pdf (Accessed : ).
Harvard Shubhranshu Mishra, Subham Sahoo, and Alok Patnaik. (2022) 'Manpower Optimization using Time Study Analysis', International Journal Of Advance Research And Innovative Ideas In Education, 8(6), pp. 2026-2035IJARIIE [Online]. Available at: https://ijariie.com/AdminUploadPdf/Manpower_Optimization_using_Time_Study_Analysis_ijariie18916.pdf (Accessed : )
IEEE Shubhranshu Mishra, Subham Sahoo, and Alok Patnaik, "Manpower Optimization using Time Study Analysis," International Journal Of Advance Research And Innovative Ideas In Education, vol. 8, no. 6, pp. 2026-2035, Nov-Dec 2022. [Online]. Available: https://ijariie.com/AdminUploadPdf/Manpower_Optimization_using_Time_Study_Analysis_ijariie18916.pdf [Accessed : ].
Turabian Shubhranshu Mishra, Subham Sahoo, and Alok Patnaik. "Manpower Optimization using Time Study Analysis." International Journal Of Advance Research And Innovative Ideas In Education [Online]. volume 8 number 6 ().
Vancouver Shubhranshu Mishra, Subham Sahoo, and Alok Patnaik. Manpower Optimization using Time Study Analysis. International Journal Of Advance Research And Innovative Ideas In Education [Internet]. 2022 [Cited : ]; 8(6) : 2026-2035. Available from: https://ijariie.com/AdminUploadPdf/Manpower_Optimization_using_Time_Study_Analysis_ijariie18916.pdf
BibTex EndNote RefMan RefWorks

Number Of Downloads



Save in Google Drive

Similar-Paper

TitleArea of ResearchAuther NameAction
UNVEILING THE POTENTIAL OF ADDITIVE MANUFACTURINGEngineeringMr. Praveen K C Download
Prediction, Optimization and Production of the Performance Indicators of an Improved Locally Produced Hybrid Brake PadMechanical EngineeringOladapo Babafemi FAKIYESI Download
Overcoming Lean Transformation Hurdles: Implementing Efficiency in the US Manufacturing IndustryIndustrial EngineeringMahboob Al Bashar Download
Productivity Optimization Techniques Using Industrial Engineering ToolsIndustrial EngineeringMahboob Al Bashar Download
CONTRACT MANAGEMENT PRACTICES AND SUPPLY CHAIN PERFORMANCE OF COUNTY REFERRAL HOSPITALS IN KENYAProcurement& LogisticsWachuka Download
ERGONOMIC HAZARD ELIMINATION IN WAREHOUSE LOGISTICS BY APPLYING THE HEIRARCHY OF CONTROL MEASURESINDUSTRIAL SAFETY ENGINEERINGMr.C.Samandi Download
Manpower Optimization using Time Study AnalysisIndustrial EngineeringShubhranshu Mishra Download
A STUDY ON HEALTH CONDITION OF BANGLADESH GARMENTS WORKERBiomedicalMd. Abdullahel Shafi Download
Garment Industry: Present Scenario in BangladeshIndustrialShams Ul Islam Download
ELIMINATION OF ERGONOMIC HAZARDS BY IMPLEMENTING THE HIERARCHY OF CONTROL MEASURES IN WAREHOUSE LOGISTICSIndustrial Safety EngineeringVignesh K Download
SELECTION OF SUITABLE HEAD PROTECTION FOR PHOSPHATING PROCESS IN VALVE MANUFACTURING INDUSTRYIndustrial Safety EngineeringVenkadesh Sriramkumar N Download
CHEMICAL HAZARDS ASSOCIATED WITH LAMINATION & INFUSION IN MOLDING PROCESS AND THEIR CONTROL MEASURESIndustrial Safety EngineeringReddy Narasimharao Download
FRP DUST MITIGATION THROUGH ENGINEERING CONTROL MEASURESIndustrial Safety EngineeringPONN VIJAY.A Download
DESIGN AND MODIFICATION OF KNUCKLE HUB ASSEMBLY LINEMechanical engineeringROHAN VIJAY PATIL Download
Cashless Humans with Electronic Paymentsindustrial technologies Venkata Krishnaswamy Suddapalli Download
12
For Authors
  • Submit Paper
  • Processing Charges
  • Submit Payment
Archive
  • Current Issue
  • Past Issue
IJARIIE Board
  • Member Of Board
  • Join As Board
Privacy and Policy
Follow us

Contact Info
  • +91-8401209201 (India)
  • +86-15636082010 (China)
  • ijariiejournal@gmail.com
  • M-20/234 Ami Appt,
    Nr.Naranpura Tele-Exch,
    Naranpura,
    Ahemdabad-380063
    Gujarat,India.
Copyright © 2025. IJARIIE. All Rights Reserved.