Logo
  • Home
  • About Us
    • Aim and Scope
    • Research Area
    • Impact Factor
    • Indexing
  • For Authors
    • Authors Guidelines
    • How to publish paper?
    • Download Paper format
    • Submit Manuscript
    • Processing Charges
    • Download Copyrights Form
    • Submit Payment-Copyrights
  • Archives
    • Current Issues
    • Past Issues
    • Conference Issues
    • Special Issues
    • Advance Search
  • IJARIIE Board
    • Join as IJARIIE Board
    • Advisory Board
    • Editorial Board
    • Sr. Reviewer Board
    • Jr. Reviewer Board
  • Proposal
    • Conferece Proposal
    • Special Proposal
    • Faqs
  • Contact Us
  • Payment Detail

Call for Papers:Vol.11 Issue.3

Submission
Last date
28-Jun-2025
Acceptance Status In One Day
Paper Publish In Two Days
Submit ManuScript

News & Updates

Submit Article

Dear Authors, Article publish in our journal for Volume-11,Issue-3. For article submission on below link: Submit Manuscript


Join As Board

Dear Reviewer, You can join our Reviewer team without given any charges in our journal. Submit Details on below link: Join As Board


Paper Publication Charges

IJARIIE APP
Download Android App

For Authors

  • How to Publish Paper
  • Submit Manuscript
  • Processing Charges
  • Submit Payment

Archives

  • Current Issue
  • Past Issue

IJARIIE Board

  • Member Of Board
  • Join As Board

Downloads

  • Authors Guidelines
  • Manuscript Template
  • Copyrights Form

Android App

Download IJARIIE APP
  • Authors
  • Abstract
  • Citations
  • Downloads
  • Similar-Paper

Authors

Title: :  Railway Tunnel Automation using PLC
PaperId: :  10457
Published in:   International Journal Of Advance Research And Innovative Ideas In Education
Publisher:   IJARIIE
e-ISSN:   2395-4396
Volume/Issue:    Volume 5 Issue 3 2019
DUI:    16.0415/IJARIIE-10457
Licence: :   IJARIIE is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Author NameAuthor Institute
Chavhanke Vishal BhausahebSND COE & RC, YEOLA
Bhagat Vinod RajendraSND COE & RC, YEOLA
Chavan Balaji AjinathSND COE & RC, YEOLA
Hembade Prajakta MadhavSND COE & RC, YEOLA
Prof. Rajnor D.L.SND COE & RC, YEOLA

Abstract

Electrical Engineering
PLC, SCADA, IR Sensor
There are certain control systems that cannot be disabled or shut down, even momentarily, because of the threat to people lives. In these applications, a redundant control system must be in place to take over instantaneously if the primary system fails. This paper aims to replace the manual work in railway protection system by automatically controlling and monitoring the train movements using PLC& SCADA. In our project controlling of various parameter are done. Like signals for incoming train, alert signal to human beings and animal, fire safety for train inside the tunnel, also it save the electricity because of automatic controlling of light inside the tunnel. Nowadays even though automation plays a vital role in almost all areas but still railway system is not completely automated. Currently the railway network protection parameters like gate control, identifying track cracks, track collision, track changing and traffic light (indication) are controlled individually by their respective process either manually or semi-automatically, Even then the simultaneous control of all parameters does not exists to ensure safety operation. And at the same time the entire control is given only from control room using embedded technology which is tedious in monitoring and providing the required control under critical situations. To overcome those problems the proposed idea provides both monitoring and control of all the above said parameters with the provision of issuing automatic control in the locomotive itself using PLC. Programmable Logic Controller (Keyence) senses the input from its respective sensors and according to the ladder program it issues the necessary control automatically.

Citations

Copy and paste a formatted citation or use one of the links to import into a bibliography manager and reference.

IJARIIE Chavhanke Vishal Bhausaheb, Bhagat Vinod Rajendra, Chavan Balaji Ajinath, Hembade Prajakta Madhav, and Prof. Rajnor D.L.. "Railway Tunnel Automation using PLC" International Journal Of Advance Research And Innovative Ideas In Education Volume 5 Issue 3 2019 Page 1462-1466
MLA Chavhanke Vishal Bhausaheb, Bhagat Vinod Rajendra, Chavan Balaji Ajinath, Hembade Prajakta Madhav, and Prof. Rajnor D.L.. "Railway Tunnel Automation using PLC." International Journal Of Advance Research And Innovative Ideas In Education 5.3(2019) : 1462-1466.
APA Chavhanke Vishal Bhausaheb, Bhagat Vinod Rajendra, Chavan Balaji Ajinath, Hembade Prajakta Madhav, & Prof. Rajnor D.L.. (2019). Railway Tunnel Automation using PLC. International Journal Of Advance Research And Innovative Ideas In Education, 5(3), 1462-1466.
Chicago Chavhanke Vishal Bhausaheb, Bhagat Vinod Rajendra, Chavan Balaji Ajinath, Hembade Prajakta Madhav, and Prof. Rajnor D.L.. "Railway Tunnel Automation using PLC." International Journal Of Advance Research And Innovative Ideas In Education 5, no. 3 (2019) : 1462-1466.
Oxford Chavhanke Vishal Bhausaheb, Bhagat Vinod Rajendra, Chavan Balaji Ajinath, Hembade Prajakta Madhav, and Prof. Rajnor D.L.. 'Railway Tunnel Automation using PLC', International Journal Of Advance Research And Innovative Ideas In Education, vol. 5, no. 3, 2019, p. 1462-1466. Available from IJARIIE, http://ijariie.com/AdminUploadPdf/Railway_Tunnel_Automation_using_PLC_ijariie10457.pdf (Accessed : 12 January 2023).
Harvard Chavhanke Vishal Bhausaheb, Bhagat Vinod Rajendra, Chavan Balaji Ajinath, Hembade Prajakta Madhav, and Prof. Rajnor D.L.. (2019) 'Railway Tunnel Automation using PLC', International Journal Of Advance Research And Innovative Ideas In Education, 5(3), pp. 1462-1466IJARIIE [Online]. Available at: http://ijariie.com/AdminUploadPdf/Railway_Tunnel_Automation_using_PLC_ijariie10457.pdf (Accessed : 12 January 2023)
IEEE Chavhanke Vishal Bhausaheb, Bhagat Vinod Rajendra, Chavan Balaji Ajinath, Hembade Prajakta Madhav, and Prof. Rajnor D.L., "Railway Tunnel Automation using PLC," International Journal Of Advance Research And Innovative Ideas In Education, vol. 5, no. 3, pp. 1462-1466, May-Jun 2019. [Online]. Available: http://ijariie.com/AdminUploadPdf/Railway_Tunnel_Automation_using_PLC_ijariie10457.pdf [Accessed : 12 January 2023].
Turabian Chavhanke Vishal Bhausaheb, Bhagat Vinod Rajendra, Chavan Balaji Ajinath, Hembade Prajakta Madhav, and Prof. Rajnor D.L.. "Railway Tunnel Automation using PLC." International Journal Of Advance Research And Innovative Ideas In Education [Online]. volume 5 number 3 (12 January 2023).
Vancouver Chavhanke Vishal Bhausaheb, Bhagat Vinod Rajendra, Chavan Balaji Ajinath, Hembade Prajakta Madhav, and Prof. Rajnor D.L.. Railway Tunnel Automation using PLC. International Journal Of Advance Research And Innovative Ideas In Education [Internet]. 2019 [Cited : 12 January 2023]; 5(3) : 1462-1466. Available from: http://ijariie.com/AdminUploadPdf/Railway_Tunnel_Automation_using_PLC_ijariie10457.pdf
BibTex EndNote RefMan RefWorks

Number Of Downloads


Last download on 1/12/2023 10:54:39 AM

Save in Google Drive

Similar-Paper

TitleArea of ResearchAuther NameAction
Low Cost Air Monitoring SystemElectronics and Telecommunication EngineeringShamsundar Kulkarni Download
Design and Analysis of Two Switch Boost ConverterElectrical And Electronics EngineeringDarimireddi Kiran Kumar Download
SIMULATION OF A NOVEL CLOSED LOOP CONTROL SCHEME FOR A SINGLE-SWITCH BUCK-BOOST CONVERTERElectrical and Electronics EngineeringDr. V. Sarayu Download
IOT BASED DIGITAL STARTERElectrical EngineeringShinde Sachin Download
Underground Cable Fault Detection Device Using GSM, GPS, TechnologyElectrical Power SystemMr. Nagnath V. Khandekar Download
Harmonic Voltage Control in Distributed Generation Systems Using Optimal Switching Vector StrategyElectrical and Electronics EngineeringB.Ramu Download
DESIGN & SIMULATION OF A SOLAR WIND HYBRID POWERSYSTEM USING MATLAB/SIMULINKElectronics EngineeringGARIMELLA MOHAN KRISHNA SAIRAM Download
DEVELOPMENT AND ACCEPTABILITY OF FIRE DETECTION AND ALARM SYSTEM (FDAS) TRAINERTechnology EducationNoel L. lafuente Download
ENHANCED VOLTAGE REGULATION USING A SIMPLIFIED 7-LEVEL INVERTERElectronics EngineeringKommi Manasa Download
Electricity Theft Survey In Rural AreaElectrical EngineeringTruptesh Narkhede Download
WIND-SOLAR HYBRID POWER GENERATION ON HIGHWAY DIVIDERSElectrical and Electronics EngineeringThiruveedula Manivarma Download
Vehicle to vehicle communication for safety alertsElectrical and electronics engineering Naraharisetti Manasa Download
TRASH TRACKER; A WASTE MANAGEMENT SYSTEMElectrical EngineeringAkireddy Renusri Download
SMART WHEELCHAIR USING VOICE, GESTURE AND EYE MOVEMENT RECOGNITIONPower Electronics EngineeringB.Thanu Sri Download
MATHEMATICAL REPRESENTATIONS OF ELECTRICAL POWERElectrical Engineering, Mathematics Sonal Nanasaheb Mhase Download
12
For Authors
  • Submit Paper
  • Processing Charges
  • Submit Payment
Archive
  • Current Issue
  • Past Issue
IJARIIE Board
  • Member Of Board
  • Join As Board
Privacy and Policy
Follow us

Contact Info
  • +91-8401209201 (India)
  • +86-15636082010 (China)
  • ijariiejournal@gmail.com
  • M-20/234 Ami Appt,
    Nr.Naranpura Tele-Exch,
    Naranpura,
    Ahemdabad-380063
    Gujarat,India.
Copyright © 2025. IJARIIE. All Rights Reserved.